Search

Refine Results
Type
Program
Status
Country
Province
City
Program Specialty Area
Field of Testing
Period range

From

To

Displaying 9049 - 9060 of 9875
Notice of Intent

Fuseholders - Part 11: Type C (Edison Base) and...

1.1.2 These requirements cover: a) fuseholders intended for use with Type C (Edison-base) and Type S Plug Fuses as described in NMX-J-009/248/11-2000-ANCE, CSA C22.2 No. 248.11, UL 248-11, Low-Voltage Fuses - Part 11: Plug...
Notice of Intent

Terrestrial photovoltaic (PV) modules - Design...

This part of IEC 61215 lays down IEC requirements for the design qualification and type approval of terrestrial photovoltaic modules suitable for long-term operation in general open-air climates, as defined in IEC 60721-2-1...
Notice of Intent

Compressed Gas Regulator Accessories

1 Scope 1.1 These minimum requirements cover accessories intended for direct connection to the low or delivery pressure side of compressed gas regulators. These devices are not intended for direct connection to high storage...
Notice of Intent

Electrical Intermediate Metal Conduit – Steel

Note: This NOI (originally published on August 3, 2022) was reissued by the responsible SDO on July 23, 2024. Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of...
Notice of Intent

Transportable hydrogen refuelling units

Note: The title and scope of this Notice of Intent (originally published on May 30, 2023) was updated by the responsible SDO on July 23, 2024. 1.1 Inclusions This Standard specifies the requirements and minimum standards for...
Notice of Intent

Competency standard for emergency responders ...

The proposed Standard will specify requirements and performance specifications for determining and evaluating competencies for emergency personnel (such as police, firefighters, and paramedics) engaged in responding to...