Search

Refine Results
Type
Status
Period range

From

To

Displaying 13 - 24 of 79
Notice of Intent

Information technology - Service management - ...

Note: The standard development activity and project need for this NOI (originally published on August 13, 2024) was updated by the responsible SDO on November 19, 2024. This part of ISO/IEC 20000 provides guidance for an...
Notice of Intent

Performance requirements for Water treatment ...

Note: This notice of intent was withdrawn by the responsible SDO on December 10, 2024. This standard provides the minimum performance requirements for components used in portable exchange service programs. The exchange...
Notice of Intent

Under sink pipe insulation protectors

Note: This notice of intent was withdrawn by the responsible SDO on December 10, 2024. This standard covers specifies requirements for materials, physical characteristics, performance testing, and markings for insulated...
Notice of Intent

Standard for Electric Vehicle Cable for Use in...

Note: The comment period for this NOI has been extended to January 22, 2025 to allow for a collaborative discussion to take place between SCC-accredited SDOs. 1 Scope 1.1 General 1.1.1 This standard specifies the requirements...
Notice of Intent

Data governance – Part 2: Third-party access ...

Note: The ICS code of this Notice of Intent (originally published on February 6, 2024) was updated by the responsible SDO on September 10, 2024. This Standard specifies minimum requirements for granting and controlling third...
Notice of Intent

Electric Vehicle Infrastructure Deployment Guideline

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of December 17, 2024, to January 14, 2025 will...
Notice of Intent

Electric Vehicle Infrastructure Accessibility...

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of December 17, 2024, to January 14, 2025 will...
Notice of Intent

Hydrogen fuel cell power systems for rolling ...

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. The title and scope for this NOI were also updated. An additional comment...
Notice of Intent

Marine shipboard cable

Note: The scope for this NOI (originally published on August 10, 2021) was updated by the responsible SDO on December 24, 2024. 1.1 This Standard specifies the requirements for distribution (power), control, and signal cables...
Notice of Intent

Standard Method of Fire Tests for Non-Metallic...

This fire test standard applies to non-metallic raceway systems for optical fibre cables, communication cables and electrical wires and cables with combustible insulation and jackets designed for use in accordance with...
Notice of Intent

Aviation Turbine Fuel

1. SCOPE 1.1 This standard applies to two grades of aviation turbine fuel (military grades F-34 and F-44) consisting of conventional hydrocarbons, synthetic hydrocarbons, naturally occurring non-hydrocarbons and additives as...