Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 325 - 336 of 8917
Publications

Global Perspectives on Standardization: Lessons...

The 17-page report highlights SCC’s two-day strategic exchange held April 14-15, 2014, with its U.S., European and Australian counterparts. Global Perspectives brings together the views of several distinguished leaders of the...
Notice of Intent

Standard for 650 ˚C Factory-Built Chimneys

These Requirements apply to Factory-Built Chimney assemblies which do not require field fabrication. They are for use with gas, liquid and solid fuel-fired residential appliances and building heating equipment, where the flue...
Notice of Intent

Standard for Water Fire Extinguishers

These requirements cover the construction and performance, exclusive of performance during fire tests, of water fire extinguishers. Water fire extinguishers are intended to be utilized in accordance with the Standard for...
Notice of Intent

Standard for Organic Light Emitting Diode (OLED...

1.1 These requirements apply to organic lighting emitting diode (OLED) panels intended for task, ambient, or aesthetic illumination, and for portable or permanent installation in accordance with the following standards, and...
Notice of Intent

Standard for LP-Gas Vaporizers

1.1 There requirements cover liquefied petroleum gas (LP-Gas) vaorizers of the stationary type. 1.2 Vaporizers covered by these requirements are intended to be installed and used in accordance with the applicable Codes and...
Notice of Intent

Standard for Control Units and Accessories for...

1.1 This Standard covers requirements as related to the following: a) Discrete electrical control units and accessories for fire alarm systems including smoke control, releasing, Building System Information Unit (BSIU), and...
Notice of Intent

Standard for Fireplace Inserts

Note: The scope for this NOI (originally published on January 22, 2019) was updated by the responsible SDO on July 27, 2021. 1.1 These requirements cover prefabricated fireplace inserts and hearth-mounted stoves for masonry...
Notice of Intent

Standard for Emergency Breakaway Fittings for...

These requirements cover emergency breakaway fittings intended only for flammable and combustible liquid service including gasoline with up to 15% ethanol. An emergency breakaway fitting is intended for use with dispensing...