Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 9697 - 9708 of 10736
Notice of Intent

Road Signs for Connected and Automated Vehicles

Note: This NOI (originally published on October 17, 2023) was reissued by the responsible SDO on July 9, 2024. Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of...
Notice of Intent

Construction Zone Applications for Connected ...

Note: This NOI (originally published on October 17, 2023) was reissued by the responsible SDO on July 9, 2024. Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of...
Notice of Intent

Cybersecurity for Connected and Automated Vehicles

Note: This NOI (originally published on October 17, 2023) was reissued by the responsible SDO on July 9, 2024. Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of...
Notice of Intent

Cellulose filaments (CF) — Preparing handsheets...

1.1 This Standard describes methods for the preparation of low-basis weight handsheets of cellulose filaments (CF) and CF-reinforced pulp handsheets to be used for physical tests. 1.2 This Standard also covers the preparation...
Notice of Intent

User Interface for Connected and Automated Vehicles

Note: This NOI (originally published on October 17, 2023) was reissued by the responsible SDO on July 9, 2024. Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of...
Notice of Intent

Organization and digitization of information ...

Note: The ICS code of this Notice of Intent (originally published on September 26, 2023) was updated by the responsible SDO on July 23, 2024. This document outlines the concepts and principles for information management at a...
Notice of Intent

Standard for Safety for Power Banks

Note: The title and scope of this Notice of Intent (originally published on March 26, 2019) was updated by the responsible SDO on July 16, 2024. These requirements cover power banks, sometimes also known as portable USB...
Notice of Intent

Series isolating transformers for airport lighting

Note: The scope of this Notice of Intent (originally published on November 28, 2023) was updated by the responsible SDO on July 16, 2024. 1.1 This Standard applies to encapsulated isolating transformers for use as a circuit...
Notice of Intent

Power conversion equipment

1.1 This Standard applies to ac and dc type power conversion equipment (PCE) that a) is of dry or liquid-filled construction; b) has a rated voltage not exceeding 1500 V; and c) is for commercial, industrial, and residential...
Notice of Intent

Evaluation of Microplastics and Nanoplastics ...

Standard specification for laboratory testing, performance assessment, and health effects evaluation of microplastics and nanoplastics originating from plumbing, water treatment and distribution, food-service equipment, and...