Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 9565 - 9576 of 10584
Notice of Intent

Fuseholders - Part 11: Type C (Edison Base) and...

1.1.2 These requirements cover: a) fuseholders intended for use with Type C (Edison-base) and Type S Plug Fuses as described in NMX-J-009/248/11-2000-ANCE, CSA C22.2 No. 248.11, UL 248-11, Low-Voltage Fuses - Part 11: Plug...
Notice of Intent

Variable Capacity Heat Pumps – Air to Water

This document provides a method for determining the seasonal energy performance of air-source, split heat pump systems designed to provide residential hot water service using a storage tank, with or without electric...
Notice of Intent

Standard for LP-Gas Vaporizers

1.1 There requirements cover liquefied petroleum gas (LP-Gas) vaorizers of the stationary type. 1.2 Vaporizers covered by these requirements are intended to be installed and used in accordance with the applicable Codes and...
Notice of Intent

Standard for Smoke Alarms

These requirements cover electrically operated single and multiple station smoke alarms intended for open area protection in indoor locations and portable smoke alarms used as "travel" alarms in accordance with: In Canada: a)...
Notice of Intent

Organization and digitization of information ...

Note: The ICS code of this Notice of Intent (originally published on September 26, 2023) was updated by the responsible SDO on July 23, 2024. This document outlines the concepts and principles for information management at a...