Refine Results
Displaying 3817 - 3828 of 11333
Notice of Intent
Braking Performance - Rubber-Tired, Self-Propelled...
This Standard describes minimum performance criteria for the service braking system, secondary braking system, and parking system for rubber-tired, self-propelled underground mining machines with maximum rated speeds of 32...
Notice of Intent
Underground Mining Mobile Equipment – General...
This standard applies to new or unused self-propelled, non-rail-bound, mobile machines for use underground non-gassy mines or gassy mines. This Standard describes the technical aspects and procedures necessary for the design...
Notice of Intent
Design and Installation of Non-Potable Water ...
1.1 These Standards specify requirements for the design and installation and for the maintenance and field testing of non-potable water systems for applications such as flushing toilets, irrigating lawns and gardens, washing...
Notice of Intent
Gas Clothes Dryers, V I, Type 2 Clothes Dryers
This Standard applies to newly produced Type 1 clothes dryers (see Clause 3, Definitions), hereinafter referred to as dryers, constructed entirely of new, unused parts and materials: use with natural gas; use with...
Notice of Intent
Quality management for kidney dialysis providers
The scope of this project is to develop the 2 nd edition of Z364.6.
Notice of Intent
Safe installation and operationi of hemodialysis...
The scope of the is to develop the 3 rd edition of Z364.5
Notice of Intent
Personal energy absorbers and lanyards
This Standard specifies requirements for the performance, design, testing, marking, and instructions of personal energy absorbers and lanyards, including lineman’s pole straps and integrally connected lanyards and energy...
Notice of Intent
Standard for Type BH Gas Venting
1.1 These requirements cover the design, construction, and performance of gas venting systems intended for negative or positive pressure venting of gas-fired appliances producing flue gases having temperatures as specified in...
Notice of Intent
Professional Customer Service - Funeral Service...
Purpose and Scope This standard is intended to establish requirements related to the quality of customer service offered by funeral service providers. When this service standard concerns management activities, such as the...
Notice of Intent
Arc Welding Equipment - Part 7: Torches
This part of IEC 60974 specifies safety and construction requirements for torches for arc welding and allied processes. In this standard, a torch consists of the torch body, the cable-hose assembly and other components.This...
Notice of Intent
Explosives - Quantity Distances
This standard is intended to establish the minimum separation distances to be used between potential explosion sites (PES) and exposed sites (ES), to reduce the risk to life and property. This standard applies to all...
Notice of Intent
Organic Soil Conditioners - Composts - Determination...
Note: The Standard Development Activity and Project Need of this Notice of Intent (originally published on February 16, 2021) was updated by the responsible SDO on February 7, 2023. Purpose This standard specifies a test...