Refine Results
Displaying 1789 - 1800 of 9144
Notice of Intent
Emergency lighting equipment
Note: The standard development activity for this NOI (originally published on August 9, 2023) was updated by the responsible SDO on August 15, 2023. 1.1 This Standard applies to exit signs, unit equipment, emergency...
Notice of Intent
Drinking water treatment chemicals - health effects
This standard establishes minimum health effects requirements for the chemicals, the chemical contaminants, and the impurities that are directly added to drinking water from drinking water treatment chemicals. This standard...
Notice of Intent
Centrifugal Stationary Pumps for Fire-Protection...
1.1 These requirements cover stationary centrifugal fire pumps intended for use in water-supply systems for fire-protection service. 1.2 The pumps covered by these requirements are intended for installation and use in...
Notice of Intent
Standard for Category 3 Aqueous Film-Forming ...
1. The Standards for foam liquid concentrates are divided into three categories. Category 1 Primarily for use on general-purpose hydrocarbon fires Category 2 Primarily for use on polar solvents, oxygenated fuels, and water...
Notice of Intent
Mental Health and Addiction Services
Note: Standard title and scope were updated on October 22, 2019 as per a request from the responsible SDO. (NOI previous version published to CNS on September 11, 2018) Note: Standard title and scope were updated on September...
Notice of Intent
Drinking Water Treatment Chemicals - Health Effects
This standard establishes minimum health effects requirements for the chemicals, the chemical contaminants, and the impurities that are directly added to drinking water from drinking water treatment chemicals. This standard...
Notice of Intent
Design and installation of ground source heat...
Note: The standard designation and scope of this Notice of Intent (originally published on November 9, 2021) were updated by the responsible SDO on 3 July 2024. 1 Scope 1.1 Standard Application This Standard applies to ground...
Notice of Intent
Standard for Installation and Services for Fire...
1 Scope 1.1 This Standard covers the: a) Construction, operation, installation, inspection and tests applicable to fire signal receiving centres for fire protective signalling services utilizing fire signal receiving centre...
Notice of Intent
Metallic and Plastic Utility Boxes
This Standard covers utility boxes intended for plumbing applications (e.g., washing machines, ice makers, tubs, gas appliances, and air admittance valves) and made of (a) acrylonitrile ‐ butadiene ‐ styrene (ABS); (b)...
Notice of Intent
Standard for Signal Receiving Centre Configurations...
1.1 This Standard covers requirements applicable to signal receiving centre facilities, protection service, service centres, satellite centres, remote data entry centres, hosted signal receiving centres, managed video signal...
Notice of Intent
Performance Requirements for Dielectric Pipe ...
Note: The standard development activity of this Notice of Intent (originally published on June 14, 2022) was updated by the responsible SDO on March 21, 2023. This standard covers specifies requirements for materials...
Notice of Intent
Standard for Signal Receiving Centre Configurations...
1.1 This Standard covers requirements applicable to signal receiving centre facilities, protection service, service centres, satellite centres, remote data entry centres, hosted signal receiving centres, managed video signal...