Refine Results
Displaying 11881 - 11892 of 12276
Notice of Intent
Operation and maintenance of health care facilities
1.1 This Standard describes the requirements, including quality system requirements, for the O&M of an HCF. It sets out specific requirements for a) buildings and architectural systems; b) site elements related to the...
Notice of Intent
Performance standard and test protocols for Thermal...
The scope consists of developing a new standard for TESS used for heating in residential, commercial and institutional building performances. As a starting point, a review of existing relevant standards (such as IEC62933-2-1...
Notice of Intent
CAN/ASC-2.8: Accessible Ready Housing
The purpose of standard CAN/ASC-2.8 is to ensure the technical requirements for accessible ready housing are equity-based. This requires going beyond minimum technical specifications. Accessible ready housing is a way to...
Notice of Intent
Single-Wall Polyethylene (PE) Pipe and Fittings...
Purpose and scope This standard specifies the characteristics and test methods of polyethylene (PE) pipe and fittings designed to carry gravity flowing liquids, including surface water evacuation, soil drainage and culverts...
Notice of Intent
Single-Wall Polyethylene (PE) Pipe and Fittings...
Purpose and scope This standard specifies the characteristics and test methods of polyethylene (PE) pipe and fittings designed to carry gravity flowing liquids, including surface water evacuation, soil drainage and culverts...
Notice of Intent
Unplasticized Poly(Vinyl Chloride) [PVC-U] Perforated...
Purpose and scope This standard specifies the characteristics and test methods relating to perforated pipes and fittings, manufactured from unplasticized poly(vinyl chloride) [PVC-U], with a nominal diameter smaller than or...
Notice of Intent
Safety requirements for electrical equipment ...
This clause of Part 1 is applicable, except as follows: 1.1.1 Equipment included in scope Replacement: Replace the second paragraph by the following: This Part 2 of IEC 61010 specifies particular safety requirements for the...
Notice of Intent
Safety requirements for electrical equipment ...
This clause of Part 1 is applicable except as follows: 1.1.1 Equipment included in scope Replacement: Replace the second paragraph by the following: This part of IEC 61010 specifies particular safety requirements for the...
Notice of Intent
Safety requirements for electrical equipment ...
This clause of Part 1 is applicable except as follows: 1.1.1 Equipment included in scope Replacement: Replace the text, except the first paragraph, by the following new text: This part of IEC 61010 applies to automatic and...
Notice of Intent
Safety requirements for electrical equipment ...
This clause of Part 1 is applicable except as follows: 1.1.1 Equipment included in scope Replacement: Replace the second paragraph by the following: This part of IEC 61010 specifies safety requirements for electrical...
Notice of Intent
Electric motor-operated hand-held tools, transportable...
This clause of Part 1 is applicable, except as follows: Addition: This part of IEC 62841 applies to hand-held circular saws, which hereinafter will be referred to as saws. This standard does not apply to saws designed for use...