Refine Results
Displaying 11245 - 11256 of 12103
Notice of Intent
Power consumption of small network equipment (...
1.1 This Standard specifies the test method for measuring and reporting the power consumption of small network equipment. Note: This Standard is technology neutral. 1.2 The following products are not covered by this Standard...
Notice of Intent
Petroleum and natural gas industries - Specific...
This part of ISO 19901 specifies methodologies for a) the design, analysis and evaluation of stationkeeping systems for floating structures used by the oil and gas industries to support 1) production 2) storage 3) drilling...
Notice of Intent
Polymeric subsurface stormwater management structures
CSA B184.0:22 - General requirements and methods of testing for polymeric subsurface stormwater management structures Scope 1.1 This Standard covers polymeric subsurface stormwater management structures and accessories used...
Notice of Intent
Photovoltaic (PV) module testing protocol for...
1.1 This Standard outlines a PV module testing protocol for quality assurance programs. It is intended to be used by financial institution and insurers, developers, independent engineers, and manufacturers. It provides best...
Notice of Intent
Platform lifts and stair lifts for barrier–free...
1.1 This Standard specifies minimum requirements for the design, construction, installation, and operation of platform lifts and stair lifts that provide barrier-free access for persons with limited mobility, travelling...
Notice of Intent
Counterweighted guardrail systems
1.1 General This Standard specifies requirements for the design, performance, testing, marking, and instructions of manufactured free-standing guardrails that rely on mass and friction and that are intended to protect workers...
Notice of Intent
Prevention and Mitigation of Workplace Violence...
Note: This NOI (originally published on August 9, 2023) was reissued by the responsible SDO on July 9, 2024. This standard covers requirements and guidance for a workplace violence and harassment prevention and management...
Notice of Intent
Emergency lighting equipment
Note: The standard development activity for this NOI (originally published on August 9, 2023) was updated by the responsible SDO on August 15, 2023. 1.1 This Standard applies to exit signs, unit equipment, emergency...
Notice of Intent
Plugs, receptacles, and cable connectors of the...
1.1 This standard applies to pin and sleeve type plugs, receptacles, power inlets, and connectors, rated up to 800 amperes and up to 600 volts ac or dc, and which may include up to eight pilot contacts. These devices are...
Notice of Intent
Secondary cells and batteries containing alkaline...
This part of IEC 62133 specifies requirements and tests for the safe operation of portable sealed secondary lithium cells and batteries containing non-acid electrolyte, under intended use and reasonably foreseeable misuse...
Notice of Intent
Photovoltaics in buildings - Part 2: Requirements...
The CAN/CSA-IEC 63092-1 specifies BIPV module requirements while this document specifies BIPV system requirements. Both parts specify building requirements and the applicable electrotechnical requirements (both in general and...
Notice of Intent
Luminaires - Part 2-2: Particular requirements...
2.1 Scope [Replace with the following] This part of CSA E60598 specifies requirements for recessed luminaires to be installed and used on branch circuits not exceeding 600 V and used in accordance with the rules of the...