Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 10585 - 10596 of 10737
Notice of Intent

Thermal-links - Requirements and application ...

This International Standard is applicable to thermal-links intended for incorporation in electrical appliances, electronic equipment and component parts thereof, normally intended for use indoors, in order to protect them...
Notice of Intent

Unplasticized Poly(Vinyl Chloride) [PVC-U] Pipe...

Purpose and scope This standard specifies the characteristics and test methods relating to pipe and fittings, manufactured from unplasticized poly(vinyl chloride) [PVC-U], with a nominal diameter smaller than or equal to 150...
Notice of Intent

CAN/ASC-2.8: Accessible Ready Housing

The purpose of standard CAN/ASC-2.8 is to ensure the technical requirements for accessible ready housing are equity-based. This requires going beyond minimum technical specifications. Accessible ready housing is a way to...
Notice of Intent

Portable Power Packs

1 Scope 1.1 These requirements cover portable and movable power packs provided with one or more batteries, electrochemical capacitors, or electrochemical capacitor modules. If provided with a battery, the battery shall be...
Notice of Intent

Diesel fuel containing biodiesel (B6–B20)

Note: The ICS Code and scope for this NOI (originally published on January 31, 2023) was updated by the responsible SDO on June 25, 2024. This National Standard of Canada applies to Type B, Bxx diesel fuel containing from 6%...
Notice of Intent

Household and similar electrical appliances - ...

This clause of Part 1 is replaced by the following. This International Standard deals with the safety of electrical appliances for heating liquids for household and similar purposes, their rated voltage being not more than...
Notice of Intent

Solid Fuel Fireplace Inserts and Hearth-Mounted...

Note: The scope of this Notice of Intent (originally published on 15 March 2022) was updated by the responsible SDO on 3 July 2024. Note: The title and scope for this NOI (originally published on March 15, 2022) were updated...