Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 1057 - 1068 of 1644
Notice of Intent

Antifreeze Solutions for Use in Fire Sprinkler...

1.1 This standard covers requirements for the performance of antifreeze solutions for fire sprinkler systems. 1.2 These solutions are intended for use in wet pipe sprinkler systems subject to freezing for installation in...
Notice of Intent

Automated Mobile Platforms (AMPs)

1 Scope 1.1 These requirements cover battery-operated mobile platforms with or without a payload, as specified in 1.2. These devices are intended to be used indoors only or as outdoor use devices in a commercial or industrial...
Notice of Intent

LP-Gas Regulators

1.1 These requirements cover pressure regulators for use with LP-Gas equipment. NOTE: For the purposes of this standard the terms “LP-Gas” and “Propane” are interchangeable. 1.2 Regulators covered by these requirements are...
Notice of Intent

Standard for Horticultural Lighting Equipment...

Note: The ICS code for this NOI has been updated (originally published on August 16, 2022) was updated by the responsible SDO on Jaunuary 4, 2023. 1.1 The requirements contained in this Standard apply to lighting equipment...
Notice of Intent

Automated Mobile Platforms (AMPs)

1 Scope 1.1 These requirements cover battery-operated mobile platforms with or without a payload, as specified in 1.2. These devices are intended to be used indoors only or as outdoor use devices in a commercial or industrial...
Notice of Intent

Battery Fire Containment Products

1.1 These requirements provide fire test and performance criteria to evaluate fire containment products intended for a battery-powered portable electronic device (PED). 1.2 The containment product may include active fire...
Notice of Intent

Standard for Safety for Power Banks

Note: The title and scope of this Notice of Intent (originally published on March 26, 2019) was updated by the responsible SDO on July 16, 2024. These requirements cover power banks, sometimes also known as portable USB...
Modular Cable System Assemblies & Fittings for Industrial Control, Signal & Power Distribution
1.1 These requirements cover a modular cable system consisting of electrical cables, factory or field installed modular connectors and other system devices. Modular cable system connectors and other system devices are only...
Standard for Multioutlet Assemblies
Note: NOI for UL 111 was withdrawn on 2018-06-19 as requested by the responsible SDO. Note: Scope updated 2018-03-20 as per a request from the responsible SDO. 1.1 These requirements cover Multioutlet Assemblies and factory...