Search

Refine Results
Type
Program
Status
Country
Province
City
Program Specialty Area
Field of Testing
Period range

From

To

Displaying 10081 - 10092 of 10324
Notice of Intent

Software engineering - Lifecycle profiles for...

1.1 Fields of application This part of ISO/IEC 29110 is applicable to Very Small Entities (VSEs). VSEs are enterprises, organizations, departments or projects of up to 25 people. The lifecycle processes described in ISO/IEC...
Notice of Intent

Particular requirements for rechargeable battery...

This clause of Part 1* is replaced by the following. * For the purposes of this Standard, the term Part 1 means CAN/CSA-C22.2 No. 60335-1 (second edition)/ UL 60335-1 (sixth edition). The machines covered in this Standard are...
Notice of Intent

Sealed wire connector systems

1.1 The requirements in this standard cover sealed wire connector systems, including insulating caps, covers, resins, tubing, and tapes provided with, or for use with, specific wire connectors. These systems are intended for...
Notice of Intent

Circular economy for construction materials – ...

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of November 21 to December 12, 2023 (originally...
Notice of Intent

Terms and definitions for circular economy in...

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of November 21 to December 12, 2023 (originally...
Notice of Intent

FUEL CELL and Water Electrolysis Technologies...

Note: The title, standard designation number and scope for this NOI (originally published on January 31, 2023) was updated by the responsible SDO on January 23, 2024. Note: The standard sub-type, scope and project need have...
Notice of Intent

Battery Circularity Standard

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of February 6 to February 27, 2024 (originally...