Refine Results
Displaying 1069 - 1080 of 1679
Notice of Intent
The Standard for Safety for Mobile Electric Vehicle...
These requirements detail the specifications for electric vehicle (EV) charging systems that include conductive EV supply equipment, possibly integrated with energy storage systems, either housed separately or within the EV...
Notice of Intent
Standard for Safety for In-building 2-Way Emergency...
These requirements cover products (e.g. repeater, transmitter, receiver, signal booster components, remote annunciators and operational consoles, power supply, and battery charging system components) used for in-building 2...
Notice of Intent
Energy Monitoring Equipment
1 Scope 1.1 These requirements cover submetering equipment and open and enclosed type current sensors intended for factory or field installation within the wiring space of enclosures for switches or overcurrent devices...
Modular Cable System Assemblies & Fittings for Industrial Control, Signal & Power Distribution
1.1 These requirements cover a modular cable system consisting of electrical cables, factory or field installed modular connectors and other system devices. Modular cable system connectors and other system devices are only...
Notice of Intent
Pre-Engineered Dry Chemical Extinguishing Systems...
These requirements cover the construction and operation of fixed pre-engineered dry chemical fire extinguishing system units and fixed automatic extinguisher units intended to be used in accordance with the Standard for Dry...
Notice of Intent
The Standard for Safety for Adapters for use ...
Note: The scope of this Notice of Intent (originally published on December 12, 2023) was updated by the responsible SDO on August 13, 2024. This standard covers devices designated as adapters and integrated adapters for...
Notice of Intent
Relocatable Structures
1 SCOPE 1.1 This standard provides the requirements for modular built relocatable temporary structures. 1.2 Relocatable structures for temporary use are a form of modular construction, built in an approved offsite facility...
Notice of Intent
Standard for Safety for LP-Gas Regulators
1.1 These requirements cover pressure regulators for use with LP-Gas equipment. NOTE: For the purposes of this standard the terms “LP-Gas” and “Propane” are interchangeable. 1.2 Regulators covered by these requirements are...
Notice of Intent
Standard for Flexible Metallic Hose
1.1 These requirements cover flexible metallic hose supplied with fittings on each end that facilitate connection without twisting the hose. They have a corrugated metal core or a nonmetallic inner core which are covered with...
Notice of Intent
Standard for Shutoff Valves for Trim and Drain...
1.1 These requirements cover shutoff valves for trim and drain purposes for fire protection service. This standard covers valve constructions such as ball valves, butterfly valves, globe valves and plug valves. 1.2 These...
Notice of Intent
Standard for Safety For Electrical Systems for...
Note: The project need for this NOI (originally published on August 18, 2020) was updated by the responsible SDO on June 22, 2021. 1 Scope 1.1 This Standard covers the electrical system of eBikes powered by a lithium-based...
Notice of Intent
Safety requirements for electrical equipment ...
Scope: 1 Scope and object This clause of Part 1 is applicable except as follows: 1.1.1 Equipment included in scope Replacement: Replace the second paragraph by the following: This part of IEC 61010 specifies safety...