Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 709 - 720 of 9299
Notice of Intent

Professional Qualifications Standard for Green...

This standard applies to an individual who installs green plumbing systems and provides layout, detail, and calculations for such systems. The purpose of this standard is to provide minimum performance criteria, identified by...
Notice of Intent

Standard for Battery Containment Enclosures

These requirements address the performance of a battery containment enclosure, as defined in this Standard, to mitigate of the heat, fire and internal deflagration hazards generated by thermal runaway of lithium-ion cells...
Notice of Intent

Standard for Alarm Valves for Fire-Protection...

1.1 These requirements cover alarm valves for use in automatic wet-pipe sprinkler systems for fire-protection service. Alarm valves covered by these requirements are of either the variable- or constant-pressure type and are...
Notice of Intent

Performance standard for rating packaged water...

1.1 This Standard applies to factory-designed and prefabricated vapour-compression chillers that include one or more hermetic or external drive compressors. 1.2 The compressor types covered under this Standard include (a)...
Notice of Intent

Standard for Spray Nozzles for Fire-Protection...

These requirements cover fixed open and automatic water spray nozzles for fire protection service. Requirements for the installation and use of fixed water spray nozzles are included in the Standard for the Water Spray Fixed...
Notice of Intent

Standard for Safety for Centrifugal Stationary...

These requirements cover centrifugal fire pumps intended for use in water-supply systems for fire-protection service. The pumps covered by these requirements are intended for installation and use in accordance with the...
Notice of Intent

Standard for Safety for Electrical Systems for...

Please note that the title, scope, and project need was updated on 2019-06-11 as requested by the responsible SDO, and an additional comment period of June 11, 2019 to July 3, 2019 applies. 1.1 This Standard covers the...
Notice of Intent

Standard for Installation of Smoke Alarms

This Standard applies to the installation of smoke alarms within dwelling units as well as within sleeping rooms / areas that are not part of dwelling units. (Refer to Appendix A, Explanatory Material, Clause A1.1 and...
Notice of Intent

Standard for Corrosion Control Additives for ...

1.1 This Standard covers requirements for corrosion control additives for fire sprinkler systems, such as corrosion inhibitors. 1.2 These solutions are intended for use in wet pipe sprinkler systems for installation in...