Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 5293 - 5304 of 5813
Notice of Intent

Live working – Guidelines for the installation...

This document, which is a Technical Report, provides recommendations for the selection and testing where necessary of conductor stringing equipment and accessory items used for the installation of bare and insulated overhead...
Notice of Intent

Variable Capacity Heat Pumps – Air to Water

This document provides a method for determining the seasonal energy performance of air-source, split heat pump systems designed to provide residential hot water service using a storage tank, with or without electric...
Notice of Intent

Fuseholders - Part 11: Type C (Edison Base) and...

1.1.2 These requirements cover: a) fuseholders intended for use with Type C (Edison-base) and Type S Plug Fuses as described in NMX-J-009/248/11-2000-ANCE, CSA C22.2 No. 248.11, UL 248-11, Low-Voltage Fuses - Part 11: Plug...
Notice of Intent

Information technology - Distributed application...

This document specifies a framework for a distributed real-time Access system. It includes: 1) an ID triggered modular system architecture, the functions of the modules, the semantics of messages those modules exchange, and...
Notice of Intent

Information technology - Learning, education ...

This document provides RDF mappings of the different MLR entities introduced in the MLR framework (ISO/IEC 19788-1 and its amendment): data element specifications (DESs), resource classes (RCs), data elements (DEs)...