Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 9985 - 9996 of 11126
Notice of Intent

Circular economy for construction materials – ...

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of November 21 to December 12, 2023 (originally...
Notice of Intent

Insulated multi-pole splicing wire connectors

1.1 This Standard covers insulated multi-pole mating or non-mating splicing wire connectors intended for field wiring and factory wiring for use in accordance with the Canadian Electrical Code, Part I, in Canada, and NFPA 70...
Notice of Intent

Sealed twist-on connecting devices

1.1 The wire connectors covered by these requirements are intended for use with copper conductor in accordance with installations covered by the National Electrical Code, NFPA 70; the Canadian Electrical Code, Part I, C22.1...
Notice of Intent

Splicing wire connectors

1.1 This Standard applies to single-polarity, hand-, or tool-applied splicing wire and cable connectors intended for use with all alloys of copper, aluminum conductors, or copper-clad aluminum conductors, or all three, in...
Notice of Intent

Boiler, pressure vessel, and pressure piping ...

Note: The scope for this NOI (originally published on September 20, 2022) was updated by the responsible SDO on October 24, 2023. 1.1 Equipment within scope Except as indicated in Clause 1.2, this Standard applies to all: a)...
Notice of Intent

Maintenance of electrical systems

Note: The scope for this NOI (originally published on November 22, 2022) were updated by the responsible SDO on February 27, 2024. 1 Scope 1.1 General This Standard specifies requirements for the maintenance of electrical...
Notice of Intent

Battery Circularity Standard

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of February 6 to February 27, 2024 (originally...