W47.1-1983

Certification of Companies for Fusion Welding of Steel Structures
1.1 This Standard stipulates the minimum requirements that must be met and adhered to by a company wishing to be certified and to maintain certification for fusion welding of steel structures, performed as part of the fabrication, fabrication and erection, or erection thereof. Note: In the case of a company having more than one plant, branch, or division, each plant shall be certified and listed separately. In this case, the term "company" as used in this Standard shall be considered to mean "plant" and a plant shall be considered as consisting of one or more shops in close proximity to each other, so that one supervisor may be reasonably expected to exercise adequate control. A company doing only erection work involving welding need not have a plant, but otherwise must conform to all the conditions of this Standard in order to be certified. 1.2 This Standard is intended to govern certification of companies and prescribes the standards and tests of procedures and personnel necessary for the issuance of a document of certification of such companies. It should not be construed as approving any products of such companies. 1.3 A condition of certification is that all welding of steel structures by a certified fabricator shall be in accordance with all the requirements of this Standard unless specified to the contrary and agreed* to between the purchaser and the fabricator. The certified fabricator shall satisfy the Bureau as to the manner in which he will assure that all work that must comply with the requirements described herein, will be performed. * Such agreement must not contravene the requirements of any governing by-law unless approval to do so is obtained form the regulatory authority. 1.4 Reference Publications This Standard refers to the following Publications and where such reference is made it shall be to the edition listed below, including all amendments published thereto: CSA Standards B51-M1981, Code for the Construction and Inspection of Boilers and Pressure Vessels; W48.1-M1980, Mild Steel Covered Arc Welding Electrodes; W48.3-M1982, Low-Alloy Steel Covered Arc Welding Electrodes; W48.4-M1980, Solid Mild Steel Filler Metals for Gas Shielded Arc Welding; W48.5-M1982, Mild Steel Electrodes for Flux Cored Arc Welding; W48.6-M1980, Bare Mild Steel Electrodes and Fluxes for Submerged-Arc Welding; W59-1982, Welded Steel Construction (Metal Arc Welding); W178-1973, Qualification Code for Welding Inspection Organizations; AWS* Standard A2.4-79, Symbols for Welding and Nondestructive Testing; CGSB Standard 48-GP-4M-1978, Certification of Nondestructive Testing Personnel (Industrial Radiography Method). * American Welding Society.
SDO:
CSA
Language:
English
ICS Codes:
03.120.20; 25.160.10
Status:
Withdrawn
Publish date:
1983-11-30
Standard Number:
W47.1-1983