Safety requirements for electrical equipment for measurement, control, and laboratory use — Part 2-034: Particular requirements for measurement equipment for insulation resistance and test equipment for electric strength

Logo
CSA Group
Standards Development Organisation:
Working Program:
Designation Number:
CAN/CSA-C22.2 No. 61010-2-034:18
Standard Type:
National Standard of Canada - Adoption of International Standard
Standard Development Activity:
Reaffirmation
ICS code(s):
19.080
71.040.10
Status:
Proceeding to development
SDO Comment Period Start Date:
SDO Comment Period End Date:
Posted On:

Scope:

Scope

1 Scope and object 

This clause of Part 1 is applicable except as follows: 

1.1.1 Equipment included in scope 

Replacement: 

Replace the text with the following: 

This group safety publication is primarily intended to be used as a product safety standard for the products mentioned in the scope, but shall also be used by technical committees in the preparation of their publications for products similar to those mentioned in the scope of this standard, in accordance with the principles laid down in IEC Guide 104 and lSO/lEC Guide 51. 

This part of IEC 61010 specifies safety requirements for measurement equipment for 
insulation resistance and test equipment for electric strength with an output voltage exceeding 50 V a.c. or 120 V d.c. 

This document also applies to combined measuring equipment which has an insulation resistance measurement function or an electric strength test measurement function. 

1.1.2 Equipment excluded from scope 

Addition: 

Add the following new items to the list: 

aa) IEC 61557-8 (Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. – Equipment for testing, measuring or monitoring of protective measures – Part 8: Insulation monitoring devices for IT systems); 
bb) IEC 61557-9 (Electrical safety in low voltage distribution systems up to 1 000 V a.c. and 1 500 V d.c. – Equipment for testing, measuring or monitoring of protective measures – Part 9: Equipment for insulation fault location in IT systems). 

Project need:

Project Need
To review the Standard within the 5 year period.

Note: The information provided above was obtained by the Standards Council of Canada (SCC) and is provided as part of a centralized, transparent notification system for new standards development. The system allows SCC-accredited Standards Development Organizations (SDOs), and members of the public, to be informed of new work in Canadian standards development, and allows SCC-accredited SDOs to identify and resolve potential duplication of standards and effort.

Individual SDOs are responsible for the content and accuracy of the information presented here. The text is presented in the language in which it was provided to SCC.