Process safety management

Designation Number:
CSA Z767
Standard Type:
National Standard of Canada - Domestic
Standard Development Activity:
New Edition
ICS code(s):
13.100
Status:
Proceeding to development
SDO Comment Period Start Date:
SDO Comment Period End Date:
Posted On:

Scope:

Scope

1.1 Facilities and workplaces impacted

This Standard identifies the requirements for a PSM system for facilities and worksites handling or storing materials that are potentially hazardous, either due to an inherent chemical, biological, toxicological, or physical property of those materials, or due to the material’s potential or kinetic energy.

1.2 Minimum lifecycle requirements

This Standard applies throughout the lifecycle of a facility or worksite, including

a) conceptual design;

b) facility siting;

c) preliminary and process design;

d) detailed engineering design;

e) construction;

f) commissioning and start-up;

g) operations/maintenance;

h) revamps/modifications;

i) decommissioning; and

j) site closure.

1.3 Polices, practices, and procedures

This Standard identifies the various policies, practices, and procedures that may be used to implement a PSM system.

Note: It is not the intent of this Standard to define prescriptive solutions that will meet the needs of every organization. Each facility or worksite, within an organization, is unique and the user of this Standard will find that a particular policy, practice, or procedure that is effective at one site might need to be modified or rewritten for it to be effective at another site. An organization may include these minimum requirements in an integrated health, safety, environmental, and risk management program or in a stand-alone PSM program in preventing incidents at facilities that manufacture, store, handle, or otherwise use potentially hazardous materials. An organization may also use this Standard as an audit tool of their PSM system.

1.4 Terminology

In this Standard, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the Standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the Standard.

Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material.

Notes to tables and figures are considered part of the table or figure and may be written as requirements.

Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

Project need:

Project Need
To update the current standard due to user experience and stakeholder feedback (new edition). This proposed New Edition is being developed at the request of members of the technical committee. It will provide the industry with improved clarity based upon user experience with the first edition of the standard. This will meet the strategic needs of the following key interests: a) ensuring that the latest approaches to process safety management are clearly and concisely included in the edition of the standard; and are available for users, b) addressing needs of regulators by providing suitable requirements; and c) supporting certification bodies.

Note: The information provided above was obtained by the Standards Council of Canada (SCC) and is provided as part of a centralized, transparent notification system for new standards development. The system allows SCC-accredited Standards Development Organizations (SDOs), and members of the public, to be informed of new work in Canadian standards development, and allows SCC-accredited SDOs to identify and resolve potential duplication of standards and effort.

Individual SDOs are responsible for the content and accuracy of the information presented here. The text is presented in the language in which it was provided to SCC.