Power installations exceeding 1 kV a.c. - Part 1: Common rules

Logo
CSA Group
Standards Development Organisation:
Working Program:
Designation Number:
CAN/CSA-C22.3 NO. 61936-1
Standard Type:
National Standard of Canada - Adoption of International Standard
Standard Development Activity:
New Edition
Status:
Proceeding to development
SDO Comment Period Start Date:
SDO Comment Period End Date:
Posted On:

Scope:

Scope

This part of IEC 61936 provides, in a convenient form, common rules for the design and the erection of electrical power installations in systems with nominal voltages above 1 kV a.c. and nominal frequency up to and including 60 Hz, so as to provide safety and proper functioning for the use intended.

This standard applies to all high voltage installations except as stated otherwise in some cases specified in other parts of IEC 61936.

This standard does not apply to the design and erection of any of the following:

- overhead and underground lines between separate installations;

- electric railways (but not the substation feeding a railway system);

- mining equipment and installations ;

- fluorescent lamp installations;

- installations on ships and off-shore installations;

- electrostatic equipment;

- test sites;

- medical equipment, e.g. medical X-ray equipment.

This standard does not apply to the design of factory-built, type-tested switchgear for which separate IEC standards exist.

This standard does not apply to the requirements for carrying out live working on electrical installation

Project need:

Project Need
na

Note: The information provided above was obtained by the Standards Council of Canada (SCC) and is provided as part of a centralized, transparent notification system for new standards development. The system allows SCC-accredited Standards Development Organizations (SDOs), and members of the public, to be informed of new work in Canadian standards development, and allows SCC-accredited SDOs to identify and resolve potential duplication of standards and effort.