Out of parameter circuit interrupter

Designation Number:
C22.2 NO. 265-12 (R2017)
Standard Type:
National Standard of Canada - Domestic
Standard Development Activity:
Reaffirmation
ICS code(s):
29.120.50
Status:
Proceeding to development
SDO Comment Period Start Date:
SDO Comment Period End Date:
Posted On:

Scope:

Scope

1.1
This Standard covers requirements for devices to detect certain out of parameter conditions of supply voltage and/or load current and mitigate, by circuit interruption, the effects of

(a) overload within utilization equipment; or
(b) over- or under-voltage, or both, that can pose a risk of fire ignition under certain conditions.

These devices are to be incorporated in certified (end) products intended for use on alternating current (ac) circuits of 120 V, 60 Hz, up to 20 A in accordance with the Canadian Electrical Code, Part I.

1.2
Devices covered by this Standard are called out of parameter circuit interrupters (OPCI), and there are three types:

(a) OPCI-I - an OPCI for overload current within a load;
(b) OPCI-V - an OPCI for over or under voltage; and
(c) OPCI-VI - an OPCI incorporating both OPCI-I and OPCI-V functions.

1.3
In CSA standards, shall is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; should is used to express a recommendation or that which is advised but not required; and may is used to express an option or that which is permissible within the limits of the standard.

Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material.

Notes to tables and figures are considered part of the table or figure and may be written as requirements.

Annexes are designated normative (mandatory) or informative (nonmandatory) to define their application.

1.4
The values given in SI units are the units of record for the purposes of this Standard. The values given in parentheses are for information and comparison only.

Project need:

Project Need
To review the Standard within the required 5 year period.

Note: The information provided above was obtained by the Standards Council of Canada (SCC) and is provided as part of a centralized, transparent notification system for new standards development. The system allows SCC-accredited Standards Development Organizations (SDOs), and members of the public, to be informed of new work in Canadian standards development, and allows SCC-accredited SDOs to identify and resolve potential duplication of standards and effort.

Individual SDOs are responsible for the content and accuracy of the information presented here. The text is presented in the language in which it was provided to SCC.