Guideline on basement flood protection and risk reduction

Logo
CSA Group
Standards Development Organisation:
Working Program:
Designation Number:
CSA Z800-18
Standard Type:
National Standard of Canada - Domestic
Standard Development Activity:
Reaffirmation
ICS code(s):
91.120.30
Status:
Proceeding to development
SDO Comment Period Start Date:
SDO Comment Period End Date:
Posted On:

Scope:

Scope

1.1 General

 

This Guideline covers measures to reduce the risks of basement flooding, and to mitigate the adverse effects on property, public safety, and public health in case of a flood event. It covers existing, new, rebuilt, and renovated houses in rural and urban settings.

 

1.2 Buildings covered

 

This Guideline covers all types of ground-related houses, with or without basements, that are considered Part 9 buildings according to the National Building Code (NBC) including

 

a) detached houses;

 

b) semi-detached houses; and

 

c) row houses.

 

Recommendations made in this Guideline are generally appropriate for houses serviced by gravity- based storm, sanitary, combined, or third pipe systems.

 

1.3 Types of flood hazards

 

The types of flood hazards addressed by the measures described in this Guideline are

 

a) overland flooding associated with precipitation events and resulting in the accumulation/ponding of rainwater and/or snow melt in and around ground-related houses;

 

b) storm and sanitary sewer backwater (surcharge);

 

c) infiltration flooding (groundwater seepage);

 

d) plumbing and drainage failures, including failure of sump systems and sewer lateral failure; and

 

e) flooding associated with improper installation of basement flood risk-reduction technologies (see Annex A).

 

Note: Users of this Guideline are reminded that any of the provisions outlined herein are subject to existing codes and standards that are applicable in the jurisdiction under which the Guideline user is operating. It is strongly recommended that appropriate licensed professionals conduct any work outlined in this Guideline. All appropriate local, provincial, and national codes and standards must be adhered to in the application of the provisions outlined herein. All appropriate permits and inspections from authorities having jurisdiction must be obtained when undertaking any of the work outlined here.

Project need:

Project Need
To review the Standard within the required 5 year period.

Note: The information provided above was obtained by the Standards Council of Canada (SCC) and is provided as part of a centralized, transparent notification system for new standards development. The system allows SCC-accredited Standards Development Organizations (SDOs), and members of the public, to be informed of new work in Canadian standards development, and allows SCC-accredited SDOs to identify and resolve potential duplication of standards and effort.