Erosion and sediment control inspection and monitoring

Designation Number:
CSA W202-18
Standard Type:
National Standard of Canada - Domestic
Standard Development Activity:
Reaffirmation
ICS code(s):
91.120
Status:
Proceeding to development
SDO Comment Period Start Date:
SDO Comment Period End Date:
Posted On:

Scope:

Scope

1.1 General

 

This Standard specifies minimum requirements for the inspection of ESC measures throughout the duration of a construction project, as well as requirements and recommendations for monitoring certain water quality parameters. It also includes a description of the required qualifications for a qualified erosion and sediment control inspector (QESCI) and a QESCI in-training (QESCI-IT). This Standard further details the required documentation and communication procedures to be followed with respect to erosion and sediment control inspection, monitoring, and other compliance measures.

 

This Standard provides

 

a) defined experience and education requirements for those considered to be qualified to perform the tasks outlined;

 

b) the minimum requirements for the inspection of ESC measures and plan implementation;

 

c) the minimum requirements, as well as recommendations, for water monitoring to determine ESC measure performance; and

 

d) the minimum requirements for documenting compliance with an ESC plan.

 

1.2 Users

 

This Standard is intended for use by those with a vested interest in ESC elements of construction projects, which can include, but is not limited to, project owners, regulatory authorities, design engineers, qualified erosion and sediment control inspectors, contractors, consultants, contract administrators, and others assigned to the inspection of ESC measures and plan implementation.

 

1.3 Application

 

1.3.1

The requirements provided in this Standard apply to construction projects that result in a disturbance to soil, including excavations, vegetation/topsoil removal, grading, and development-related activities that could impact an environmental feature (for example, a watercourse, wetland, or forest) or existing infrastructure. This Standard also applies where ESC measures are required by contract, permit, approval, regulation, or other authorization. Its application begins with the design and implementation of ESC measures on a construction site and continues throughout the lifespan of the project or until such time that stabilization goals have been achieved.

 

1.3.2

This Standard applies to the inspection and monitoring of ESC measures designed and implemented during all phases of construction of

 

a) buildings (including but not limited to housing subdivisions, commercial centres, and schools);

 

b) infrastructure (including but not limited to roads, bridges, utilities, and sewers and watermains); and

 

c) expansion or rehabilitation of any of these facilities or structures.

 

1.3.3

The requirements provided in this Standard do not apply to

 

a) construction projects that are less than 1 ha (10,000 sq. m) in size, unless the project owner or regulatory authority specifies otherwise, and where runoff from the site would not result in offsite sediment impacts to surrounding environmental features or drainage infrastructure;

 

b) natural resources extraction operations (e.g., mining, drilling);

 

c) farming practices; and

 

d) construction projects where project owners or regulatory authorities have demonstrated a low risk of earth disturbance sufficient enough to cause erosion or create a risk of sedimentation.

 

1.4 Terminology

 

In this Standard, shall is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the Standard; should is used to express a recommendation or that which is advised but not required; and may is used to express an option or that which is permissible within the limits of the Standard.

 

Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material.

 

Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

Project need:

Project Need
To review the Standard within the required 5 year period.

Note: The information provided above was obtained by the Standards Council of Canada (SCC) and is provided as part of a centralized, transparent notification system for new standards development. The system allows SCC-accredited Standards Development Organizations (SDOs), and members of the public, to be informed of new work in Canadian standards development, and allows SCC-accredited SDOs to identify and resolve potential duplication of standards and effort.

Individual SDOs are responsible for the content and accuracy of the information presented here. The text is presented in the language in which it was provided to SCC.