Electromagnetic compatibility (EMC) - Part 4-9: Testing and measurement techniques - Impulse magnetic field immunity test

Designation Number:
IEC 61000-4-9
Standard Type:
National Standard of Canada - Adoption of International Standard
Standard Development Activity:
New Edition
ICS code(s):
33.100.20
Status:
Proceeding to development
SDO Comment Period Start Date:
SDO Comment Period End Date:
Posted On:

Scope:

Scope

This part of IEC 61000 specifies the immunity requirements, test methods, and range of recommended test  levels for equipment subjected to impulse magnetic disturbances mainly encountered in:

– industrial installations,
– power plants,
– railway installations,
– medium voltage and high voltage sub-stations.

The applicability of this standard to equipment installed in different locations is determined by the presence of the phenomenon, as specified in Clause 4.

This standard does not consider disturbances due to capacitive or inductive coupling in cables or other parts of the field installation. Other IEC standards dealing with conducted disturbances cover these aspects.

The object of this standard is to establish a common reference for evaluating the immunity of electrical and electronic equipment when subjected to impulse magnetic fields. The test method documented in this part of IEC 61000 describes a consistent method to assess the immunity of an equipment or system against a defined phenomenon.

NOTE As described in IEC Guide 107, this is a basic EMC publication for use by product committees of the IEC.

As also stated in Guide 107, the IEC product committees are responsible for determining whether this immunity test standard is applied or not, and if applied, they are responsible for determining the appropriate test levels and performance criteria. TC 77 and its sub-committees are prepared to co-operate with product committees in the evaluation of the value of particular immunity test levels for their products.

This standard defines:

– a range of test levels;
– test equipment;
– test setups;
– test procedures.

The task of the described laboratory test is to find the reaction of the equipment under test (EUT) under specified operational conditions to impulse magnetic fields caused by switching and lightning effects.

Project need:

Project Need
The primary objective of the standard is to maintain alignment with international requirements. This proposed New Edition is being developed at the request of the EMC Committee. It will provide the industry with alignment with the latest international requirements. This will meet the strategic needs of the following key interests: a) ensuring that the latest innovative/technology/safety features are available for users,

Note: The information provided above was obtained by the Standards Council of Canada (SCC) and is provided as part of a centralized, transparent notification system for new standards development. The system allows SCC-accredited Standards Development Organizations (SDOs), and members of the public, to be informed of new work in Canadian standards development, and allows SCC-accredited SDOs to identify and resolve potential duplication of standards and effort.

Individual SDOs are responsible for the content and accuracy of the information presented here. The text is presented in the language in which it was provided to SCC.