Refine Results
Displaying 781 - 792 of 9332
Notice of Intent
Standard for the Servicing of Halon and Clean...
1 Scope 1.1 These requirements apply to companies involved in the charging, recharging, maintenance, repair, inspection and decommissioning of halon and clean agent extinguishing systems and equipment, including the...
Notice of Intent
Standard for Gas and Vapour Detectors and Sensors...
This Standard covers requirements for permanently installed, portable and transportable toxic and combustible gas and vapour detectors and sensors, including accessories, intended to be employed in indoor locations or outdoor...
Notice of Intent
STANDARD FOR FORGED EXTERNAL-LUG QUICK-CONNECT...
1.1 This Standard contains requirements for 25 and 38 mm forged quick connect couplings and adapters of the external lug design for use in the forestry service. NOTE 1: Quick connect coupling and adapter sizes stated refer to...
Notice of Intent
Standard for Safety for Active Fire Protection...
These requirements cover the performance requirements for active fire protection, specifically detection and suppression features, used in air cargo containers to contain a fire initiated inside the container. The...
Notice of Intent
Standard for Installation and Services for Fire...
1 Scope 1.1 This Standard covers the: a) Construction, operation, installation, inspection and tests applicable to fire signal receiving centres for fire protective signalling services utilizing fire signal receiving centre...
Notice of Intent
Standard laboratory methods of test for rating...
1.1.1 This Standard applies to packaged heat/energy-recovery ventilators (HRVs/ERVs) that consist of factory-assembled elements, including fans or blowers, in which heat or heat and moisture are transferred between two...
Notice of Intent
Performance standard for split-system and single...
1.1 General 1.1.1 This Standard applies to unitary air conditioners and heat pumps that are a) factory-made; b) air-source and/or air-sink; c) split-system matching assemblies (including mini-split and multi-split) or single...
Notice of Intent
Standard for the Installation, Inspection and...
This Standard prescribes requirements for: A The installation of intrusion alarm systems. B The classification of extent of protection; and C The testing and inspection of intrusion alarm systems. Intrusion alarm systems are...
Notice of Intent
Standard for Mineral Fibre Thermal Insulation...
1.1 This Standard applies to mineral fibre thermal insulation manufactured in the form of faced and unfaced batts, rolls and boards. Where facings are used, they shall be either permeable or vapour retarding membranes, as...
Notice of Intent
Standard for Heat Actuated Fire Detectors for...
1.1 These requirements cover heat actuated fire detectors in ordinary (nonhazardous) and outdoor locations, for use as components in automatic fire protective systems, to be installed in accordance with the Standard for the...
Notice of Intent
Standard for the Servicing of Commercial Cooking...
Note: The title, scope, and project need for this NOI was updated by the responsible SDO on May 26, 2021 (originally published July 28, 2020) 1 Scope 1.1 These requirements apply to companies involved in the installing...
Notice of Intent
Competency Standard for diving, hyperbaric chamber...
This will be the fourth edition of CSA Z275.4. The Standard contains requirements and performance specifications for determining and measuring competency levels for divers and their associated team members. The new edition of...