Search

Refine Results
Type
Status
Period range

From

To

Displaying 517 - 528 of 8733
Notice of Intent

Standard for Installation of Fire Alarm Systems

This Standard describes the requirements for the design and installation of a fire alarm system with or without voice communication capability. NOTE 1: This Standard is intended to apply to both required and voluntary fire...
Notice of Intent

The Standard for Safety for Unmanned Aircraft...

These requirements cover the electrical system of unmanned aircraft systems (UASs), as defined in this Standard, used in flight for commercial applications or flight incidental to business applications. UASs covered by these...
Notice of Intent

STANDARD FOR INSTALLATION OF FIRE ALARM SYSTEMS

1 Scope 1.1 This Standard describes the requirements for the design and installation of a fire alarm system with or without voice communication capability. NOTE 1: This Standard is intended to apply to both required and...
Notice of Intent

Standard for Safety for Check Valves for Fire...

These requirements cover check valves of 1 NPS and larger, used in piping systems supplying water for fire protection service. The check valves covered by these requirements are intended for installation and use in accordance...
Notice of Intent

Performance standard for rating packaged water...

Scope 1.1 This Standard applies to factory-designed and prefabricated vapour-compression chillers that include one or more hermetic or external drive compressors. 1.2 The compressor types covered under this Standard include...
Notice of Intent

STANDARD FOR VERIFICATION OF FIRE ALARM SYSTEMS

1.1 This Standard prescribes inspection and test procedures for the purpose of verifying that the fire alarm system is installed in conformance with the design and CAN/ULC-S524, Standard for Installation of Fire Alarm Systems...
Notice of Intent

STANDARD FOR PERFORMANCE OF VIDEO SURVEILLANCE...

This standard provides minimum acceptable performance parameters for video surveillance systems. The system stakeholder determines the video surveillance system operational requirements. Refer to Section 8, System Operational...
Notice of Intent

Standard for Measuring and Reporting Circular...

Note: An additional comment period of Ausgust 13 to September 4, 2019 has been applied to ANSI/CAN/UL 3600, as the standard was in the initial stages of development for more than 12 months. All corresponding dates will apply...