Search

Refine Results
Type
Status
Period range

From

To

Displaying 193 - 204 of 8733
Notice of Intent

Standard for Dry Chemical Fire Extinguishers

These requirements cover the construction and performance, exclusive of performance during fire tests, of portable dry chemical and dry powder (Class D) fire extinguishers. Dry chemical and dry powder fire extinguishers are...
Notice of Intent

Standard for Factory-Built Grease Ducts

These requirements cover factory-built grease ducts and grease duct assemblies that are intented to be installed as alternatives to the grease ducts constructed of all welded 1.37 mm carbon steel or 1.09 mm stainless steel...
Notice of Intent

Standard for Factory-Built Grease Ducts

These requirements cover factory-built grease ducts and grease duct assemblies that are intented to be installed as alternatives to the grease ducts constructed of all welded 1.37 mm carbon steel or 1.09 mm stainless steel...
Notice of Intent

Standard for Water Fire Extinguishers

This is the common UL and ULC Standard for Water Fire Extinguishers. These requirements cover the construction and performance, exclusive of performance during fire tests, of water fire extinguishers. Water fire extinguishers...
Notice of Intent

Standard for Water Fire Extinguishers

This is the common UL and ULC Standard for Water Fire Extinguishers. These requirements cover the construction and performance, exclusive of performance during fire tests, of water fire extinguishers. Water fire extinguishers...
Notice of Intent

The Standard for Safety for Component Tapes

Please note the scope was updated as requested by the responsible SDO on March 12, 2019. 1 Scope 1.1 This standard covers adhesive and non-adhesive backed tapes intended for use with finished electro-mechanical products. 1.2...
The Canadian Smart Grid Standards Roadmap
The goal of this document is to provide a roadmap—a strategic plan—to advance the standards environment from today’s legacy electricity grid to tomorrow’s full deployment, operation and evolution of the Canadian Smart Grid...
Notice of Intent

STANDARD METHOD OF TEST FOR THE EVALUATION OF...

1.1 The purpose of the test is to evaluate the temperature transmission performance of a protective covering over foamed plastic when the assembly is subjected to a standard fire exposure condition following the Standard Time...
Notice of Intent

Standard for Factory-Built Type A Chimneys

1.1 These requirements apply to Factory-Built Type A Chimneys, which do not require field fabrication. They are for use with gas and liquid fuel-fired residential appliances and building heating equipment, where the appliance...