Refine Results
Displaying 10705 - 10716 of 11121
Notice of Intent
Standard for Emergency Breakaway Fittings, Swivel...
1.1 These requirements cover emergency breakaway fittings, swivel connectors and pipe-connecting fittings of the threadless compression type. Connectors and fittings covered by these requirements are intended only for the...
Notice of Intent
Standard for Emergency Breakaway Fittings, Swivel...
1.1 These requirements cover emergency breakaway fittings, swivel connectors and pipe-connecting fittings of the threadless compression type. Connectors and fittings covered by these requirements are intended only for the...
Notice of Intent
Solid Fuel Fireplace Inserts and Hearth-Mounted...
Note: The scope of this Notice of Intent (originally published on 15 March 2022) was updated by the responsible SDO on 3 July 2024. Note: The title and scope for this NOI (originally published on March 15, 2022) were updated...
Notice of Intent
Standard for Hose and Hose Assemblies for Use...
1.1 These requirements cover hose and hose assemblies for use on dispensing devices for fuels. A flammable liquid hose assembly consists of flexible hose and fittings suitable for attachment to fuel dispensing equipment...
Notice of Intent
Standard for Suspended Ceiling Power Grid Systems...
1.1 These requirements cover suspended ceiling grid low voltage/extra-low voltage systems and equipment intended for installation and use in accordance with the: In Canada: Canadian Electrical Code, Part I, Safety Standard...
Notice of Intent
Standard for Power-Operated Dispensing Devices...
1.1 These requirements apply to power-operated dispensing devices, rated 600 V ac or less, for use with fuels. Fuels, as defined by these requirements, include one or more of the fuels described in 1.3. 1.2 Power-Operated...
Accreditation Bulletin
Bulletin 2017-19
Action required Effective immediately, all laboratories must now refer to SCC Guidelines for the Presentation of Laboratory Scopes of Accreditation and cease referring to CAN-P-1570 - Appendix A - Guidelines for the...
Accreditation Bulletin
SCC Requirements and Guidance for Method Validation...
Action required Effective immediately, all laboratories must now refer to SCC Requirements and Guidance for Method Validation in Testing Laboratories and cease referring to CAN-P-1629 PALCAN Guidance For The Validation Of...