Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 9169 - 9180 of 10837
Notice of Intent

Heating fuel oil

This standard applies to three types of middle distillate fuel oils that are suitable for use in liquid-fuel-burning equipment without preheating (Types 0, 1 and 2), and three types of fuel oils that contain residual fuel...
Notice of Intent

Diesel fuel containing biodiesel (B6–B20)

This standard applies to Type B, Bxx diesel fuel containing from 6% to 20% by volume of biodiesel. Fuel to this standard is intended for use in high-speed diesel powered equipment for on-road and off-road applications and in...
Notice of Intent

Programmable Controllers - Part 2: Equipment ...

1. Scope and object This Part of IEC 61131 specifies requirements and related tests for programmable controllers (PLC) and their associated peripherals (for example, programming and debugging tools (PADTs), human-machine...
Notice of Intent

Overhead systems

Scope 1.1 This Standard applies to electric supply and communication lines and equipment located entirely outside of buildings and fenced supply stations. 1.2 Existing installations (including maintenance replacements and...
Notice of Intent

Swimming-pool luminaires, submersible luminaires...

Scope 1.1 This Standard applies to submersible lighting systems and associated components for installation in accordance with the Canadian Electrical Code, Part I that are: a) permanently connected to branch circuit; or b)...
Notice of Intent

Information Technology - Document Processing ...

1. Scope This standard addresses the construction and use of test suites for verifying conformance of SGML systems. Its provisions assist those who build test suites, those who build SGML systems to be evaluated by such...
Notice of Intent

Testing method for measuring energy consumption...

1.1 This Standard describes the test procedures required to perform a 24 h simulated-use test. This Standard also provides the calculations required to determine the first-hour rating, maximum flow rate, recovery efficiency...