Refine Results
Displaying 277 - 288 of 763
Notice of Intent
Energy Storage Systems and Equipment
1 Scope 1.1 These requirements cover energy storage systems that are intended to store energy from power or other sources and provide electrical or other types of energy to loads or power conversion equipment. The energy...
Notice of Intent
Standard for Pre-Engineered Dry and Wet Chemical...
Note: The project need for this NOI (originally published on April 8, 2021) was updated by the responsible SDO on June 22, 2021. These requirements cover the construction and operation of fixed pre-engineered dry chemical...
Notice of Intent
Medical electrical equipment — Part 2-61: Particular...
This document applies to the basic safety and essential performance of pulse oximeter equipment intended for use on humans, hereafter referred to as me equipment. This includes any part necessary for normal use, including the...
Notice of Intent
Energy Storage Systems and Equipment
1 Scope 1.1 These requirements cover energy storage systems that are intended to receive electric energy and then to store the energy in some form so that the energy storage system can provide electrical energy to loads or to...
Notice of Intent
Measuring and Reporting Circular Economy Aspects...
Note: The comment period for this NOI has been extended to October 19, 2022 to allow for a collaborative discussion to take place between SCC-accredited SDOs. Note: This NOI was withdrawn by the responsible SDO on October 6...
Notice of Intent
Relocatable Structures
1.1 This standard provides the requirements for modular built relocatable temporary structures. 1.2 Relocatable structures for temporary use are a form of modular construction, built in an approved offsite facility, designed...
Notice of Intent
Thermoplastic nonpressure piping compendium
CSA B181.0:24 - Definitions, general requirements, and methods of testing for thermoplastic nonpressure piping Scope 1.1 Scope of the B1800 compendium This Compendium specifies requirements for compounds and for manufactured...
Notice of Intent
Relocatable Structures
1 SCOPE 1.1 This standard provides the requirements for modular built relocatable temporary structures. 1.2 Relocatable structures for temporary use are a form of modular construction, built in an approved offsite facility...
Notice of Intent
Safety requirements for electrical equipment ...
This clause of Part 1 is applicable, except as follows: 1.1.1 Equipment included in scope Replacement: Replace the text with the following: This part of IEC 61010 specifies particular safety requirements for CABINET X-RAY...
Modular Cable System Assemblies & Fittings for Industrial Control, Signal & Power Distribution
1.1 These requirements cover a modular cable system consisting of electrical cables, factory or field installed modular connectors and other system devices. Modular cable system connectors and other system devices are only...
Notice of Intent
Pipeline system safety metrics
1.1 This Standard applies to oil and gas industry pipeline systems that convey a) liquid hydrocarbons, including crude oil, multiphase fluids, condensate, liquid petroleum products; b) natural gas liquids and liquefied...