Search

Refine Results
Type
Program
Status
Country
Province
City
Program Specialty Area
Field of Testing
Period range

From

To

Displaying 10177 - 10188 of 10324
Notice of Intent

Standard for Safety For Electrical Systems for...

Note: The project need for this NOI (originally published on August 18, 2020) was updated by the responsible SDO on June 22, 2021. 1 Scope 1.1 This Standard covers the electrical system of eBikes powered by a lithium-based...
Notice of Intent

Standard for Safety for LP-Gas Regulators

1.1 These requirements cover pressure regulators for use with LP-Gas equipment. NOTE: For the purposes of this standard the terms “LP-Gas” and “Propane” are interchangeable. 1.2 Regulators covered by these requirements are...
Notice of Intent

Standard for Shutoff Valves for Trim and Drain...

1.1 These requirements cover shutoff valves for trim and drain purposes for fire protection service. This standard covers valve constructions such as ball valves, butterfly valves, globe valves and plug valves. 1.2 These...
Notice of Intent

Standard for Flexible Metallic Hose

1.1 These requirements cover flexible metallic hose supplied with fittings on each end that facilitate connection without twisting the hose. They have a corrugated metal core or a nonmetallic inner core which are covered with...
Notice of Intent

Automatic Sprinklers for Fire-Protection Service

Note: The project need of this Notice of Intent (originally published on December 6, 2022) was updated by the responsible SDO on January 31, 2023. These requirements cover automatic sprinklers including conventional, spray...
Notice of Intent

Rubber Gasketed Fittings for Fire-Protection ...

1.1 This standard covers rubber gasketed fittings intended for assembling sections of pipe in fire protection systems, for example, couplings to attach pipe sections end to end, and side outlets to attach pipe sections at...
Notice of Intent

Components for Personal Flotation Devices

Note: The project need of this Notice of Intent (originally published on January 17, 2023) was updated by the responsible SDO on January 31, 2023. These requirements cover components intended for use in the manufacturer of...
Notice of Intent

Standard for Electrically Operated Valves for...

Note: This notice of intent was withdrawn by the responsible SDO on June 20, 2023. Note: The standard development activity for this NOI (originally published on June 6, 2023) was updated by the responsible SDO on June 13...
Notice of Intent

Standard for Organic Light Emitting Diode (OLED...

1.1 These requirements apply to organic lighting emitting diode (OLED) panels intended for task, ambient, or aesthetic illumination, and for portable or permanent installation in accordance with the following standards, and...
Notice of Intent

Fire Testing of Fire Extinguishing Systems for...

These requirements cover the performance during fire tests of pre-engineered fire extinguishing system units intended for the protection of commercial cooking equipment for restaurants, cafeterias and other similar venues...
Notice of Intent

The standard for Megawatt Charging Configured...

These requirements cover vehicle connectors and vehicle inlets designated as, and configured as, megawatt charging couplers. These devices are rated up to 1500 Vdc, 3000 A under conditions of continuous use. Vehicle...