Search

Refine Results
Type
Program
Status
Country
Province
City
Program Specialty Area
Field of Testing
Period range

From

To

Displaying 9757 - 9768 of 9874
Notice of Intent

Standard for Safety For Electrical Systems for...

Note: The project need for this NOI (originally published on August 18, 2020) was updated by the responsible SDO on June 22, 2021. 1 Scope 1.1 This Standard covers the electrical system of eBikes powered by a lithium-based...
Notice of Intent

Standard for Hose and Hose Assemblies for Use...

1.1 These requirements cover hose and hose assemblies for use on dispensing devices for fuels. A flammable liquid hose assembly consists of flexible hose and fittings suitable for attachment to fuel dispensing equipment...
Notice of Intent

Standard for Power-Operated Dispensing Devices...

1.1 These requirements apply to power-operated dispensing devices, rated 600 V ac or less, for use with fuels. Fuels, as defined by these requirements, include one or more of the fuels described in 1.3. 1.2 Power-Operated...
Notice of Intent

Standard for Organic Light Emitting Diode (OLED...

1.1 These requirements apply to organic lighting emitting diode (OLED) panels intended for task, ambient, or aesthetic illumination, and for portable or permanent installation in accordance with the following standards, and...
Notice of Intent

Automatic Sprinklers for Fire-Protection Service

Note: The project need of this Notice of Intent (originally published on December 6, 2022) was updated by the responsible SDO on January 31, 2023. These requirements cover automatic sprinklers including conventional, spray...
Notice of Intent

Rubber Gasketed Fittings for Fire-Protection ...

1.1 This standard covers rubber gasketed fittings intended for assembling sections of pipe in fire protection systems, for example, couplings to attach pipe sections end to end, and side outlets to attach pipe sections at...
Notice of Intent

Components for Personal Flotation Devices

Note: The project need of this Notice of Intent (originally published on January 17, 2023) was updated by the responsible SDO on January 31, 2023. These requirements cover components intended for use in the manufacturer of...
Notice of Intent

Fire Testing of Fire Extinguishing Systems for...

These requirements cover the performance during fire tests of pre-engineered fire extinguishing system units intended for the protection of commercial cooking equipment for restaurants, cafeterias and other similar venues...
Notice of Intent

The standard for Megawatt Charging Configured...

These requirements cover vehicle connectors and vehicle inlets designated as, and configured as, megawatt charging couplers. These devices are rated up to 1500 Vdc, 3000 A under conditions of continuous use. Vehicle...
Notice of Intent

The Standard for Safety for Adapters for use ...

Note: The scope of this Notice of Intent (originally published on December 12, 2023) was updated by the responsible SDO on August 13, 2024. This standard covers devices designated as adapters and integrated adapters for...