Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 11029 - 11040 of 12081
Notice of Intent

Impedance heating of pipelines and equipment - ...

1.1 General This standard is divided into seven clauses. Clause 1 provides the scope and purpose. Clause 2 lists references to other standards that are useful in applying this standard. Clause 3 references definitions that...
Notice of Intent

Electromagnetic compatibility (EMC) - Part 3-...

This part of IEC 61000, which is informative in its nature, provides guidance on principles that can be used as the basis for determining the requirements for the connection of disturbing installations to low voltage (LV)...
Notice of Intent

Window, door, and skylight installation

1.1 This Standard sets forth methods for both new installation and replacement installation of factory assembled windows, exterior doors, and skylights that are intended for installation in low-rise buildings and buildings...
Notice of Intent

Outdoor cooking specialty gas appliances

1.1 Applicable equipment This Standard applies to newly produced, outdoor cooking specialty gas appliances, hereinafter referred to as “appliances”, constructed entirely of new, unused parts and materials. Note: Appliances...
Notice of Intent

Industrial gas-fired natural draft heaters for...

CSA/ANSI 3.21:19, Part 1 - Industrial gas-fired natural draft heaters for installation in non-hazardous locations in oil and gas process applications Scope 1.1 CSA/ANSI 3.21, Industrial gas-fired natural draft heaters for...
Notice of Intent

Uninterruptible power systems

1 General Replace this clause of the RD with the following: 1.1.1 Equipment covered by this Standard This Standard applies to UNINTERRUPTIBLE POWER SYSTEMS (UPS). The primary function of the UPS for this Standard is to ensure...
Notice of Intent

Plant Oil Extraction Equipment for Installation...

1.1 This Standard covers commercial and industrial plant oil extraction equipment for installation and use indoors in ordinary (unclassified) locations and hazardous (classified) locations. Hazardous locations are also...
Notice of Intent

Standard for Gas and Vapour Detectors and Sensors...

This Standard covers requirements for permanently installed, portable and transportable toxic and combustible gas and vapour detectors and sensors, including accessories, intended to be employed in indoor locations or outdoor...
Notice of Intent

Standard Test Method for Determination of Long...

This procedure defines the long-term thermal resistance (LTTR) of a foam product as the value measured after 5-year storage in a laboratory environment and provides means for its prediction based on an accelerated laboratory...