Search

Refine Results
Type
Program
Status
Country
Province
City
Program Specialty Area
Field of Testing
Period range

From

To

Displaying 445 - 456 of 670
Notice of Intent

Road vehicles - Liquefied natural gas (LNG) fuel...

Note: The scope for this NOI (originally published on March 15, 2022) was updated by the responsible SDO on April 21, 2022. This document specifies tests and requirements for the rigid fuel line in copper and its alloys, a...
Notice of Intent

Standard for Installation of Fire Alarm Systems

1.1 This Standard describes the requirements for the design and installation of a fire alarm system with or without voice communication capability. NOTE 1: This Standard is intended to apply to both required and voluntary...
Notice of Intent

Performance Standard for Rating Large and Single...

.1 The purpose of this Standard is to establish the following for large and single packaged vertical air conditioners and heat pumps: (a) definitions; (b) classifications; (c) test requirements; (d) rating requirements; (e)...
Notice of Intent

Aviation turbine fuel (Grades F-34, F-37 and ...

Note: The standard designation number for this NOI (originally published on November 2, 2021), was updated by the responsible SDO on November 9, 2021. This standard applies to three grades of aviation turbine fuel (military...
Notice of Intent

Series isolating transformers for airport lighting

Note: The scope of this Notice of Intent (originally published on November 28, 2023) was updated by the responsible SDO on July 16, 2024. 1.1 This Standard applies to encapsulated isolating transformers for use as a circuit...
Notice of Intent

Battery Circularity Standard

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of December 17, 2024, to January 14, 2025 will...
Notice of Intent

Breakaway devices for natural gas dispensing ...

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of November 13 to December 4, 2024 (originally...
Notice of Intent

Bare and covered ferrules

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of August 22 to September 13, 2023 (originally...
Notice of Intent

Standard for Safety for Power Banks

Note: The title and scope of this Notice of Intent (originally published on March 26, 2019) was updated by the responsible SDO on July 16, 2024. These requirements cover power banks, sometimes also known as portable USB...
Notice of Intent

Watershed-based flood and erosion management ...

Note: The title and scope for this NOI (originally published on May 30, 2023) was updated by the responsible SDO on March 19, 2024. Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the...
Notice of Intent

Standard for Installation of Fire Alarm Systems

This Standard describes the requirements for the design and installation of a fire alarm system with or without voice communication capability. This Standard is intended to apply to both required and voluntary fire alarm...