Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 865 - 876 of 9015
Notice of Intent

Standard Method of Test for Determination of ...

This Standard provides a means of determining the non-combustible nature of elementary building materials. It shall be applied to materials used in the construction of buildings. It does not apply to materials with a...
Notice of Intent

Standard Method of Test for Determination of ...

This Standard provides a means of determining the non-combustible nature of elementary building materials. It shall be applied to materials used in the construction of buildings. It does not apply to materials with a...
Notice of Intent

Performance standard for split-system and single...

1.1 General 1.1.1 This Standard applies to unitary air conditioners and heat pumps that are a) factory-made; b) air-source and/or air-sink; c) split-system matching assemblies (including mini-split and multi-split) or single...
Notice of Intent

Standard for Site Quality Assurance Program for...

This standard outlines the requirements for a site quality assurance program (SQAP) for the on-site installation of spray applied polyurethane foam (SPF). As the installation of the material is dependent on the installer, a...
Notice of Intent

Information Technology - Processing Languages...

.1 This International Standard defines a language for the specification of electronic documents, comprised of black and white, gray scale, or full color text, images, and geometric graphics, in a form suitable for...
Notice of Intent

Standard for Additive Manufacturing Facility ...

This standard covers additive manufacturing facility safety management. It addresses the various hazards associated with material, equipment and facility where parts are manufactured using powder-based additive manufacturing...
Notice of Intent

Standard for Installation and Services for Fire...

This Standard covers the: a) Construction, operation, installation, inspection and tests applicable to fire signal receiving centres for fire protective signalling services utilizing fire signal receiving centre facilities...
Notice of Intent

Standard for Safety for Portable UV Germicidal...

Note: The comment period for this NOI has been extended to May 13, 2022 to allow for a collaborative discussion to take place between SCC-accredited SDOs. The requirements in this proposed new standard apply to portable UV...