Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 10333 - 10344 of 11126
Notice of Intent

Functional safety - Safety instrumented systems...

This part of IEC 61511 gives requirements for the specification, design, installation, operation and maintenance of a safety instrumented system (SIS), so that it can be confidently entrusted to achieve or maintain a safe...
Notice of Intent

Household and similar electrical appliances — ...

This clause of Part 1 is replaced by the following. This International Standard deals with the safety of gas, oil and solid-fuel burning appliances having electrical connections, for household and similar purposes, their...
Notice of Intent

STANDARD FOR CONTROL UNITS FOR FIRE ALARM SYSTEMS

1 Scope 1.1 This Standard covers control units, fire alarm systems and control unit accessories for use in accordance with the Standard for the Installation of Fire Alarm Systems, CAN/ULC-S524, in accordance with CSA-C22.1...
Notice of Intent

Care-in-Place Competency Standard

This standard is intended to support all workers providing care-in-place and their employers by providing competency requirements and guidance for occupations and roles. Care-in-place refers to all services (e.g...
Notice of Intent

Explosive atmospheres — Part 28: Protection of...

This part of IEC 60079 specifies the requirements, testing and marking of equipment emitting optical radiation intended for use in explosive atmospheres. It also covers equipment located outside the explosive atmosphere or...
Notice of Intent

Measurement of noise exposure

1.1 This Standard describes methods for determining the occupational noise exposure level of workers (Lex,T) using sampling techniques. Lex,T represents the long-term noise exposure of workers and is calculated from...
Notice of Intent

Workwear for protection against hydrocarbon flash...

Note: The standards development activity and project need for this NOI (originally published on February 8, 2022), was updated by the responsible SDO on August 3, 2022. The project need was updated on September 7, 2022. This...
Notice of Intent

Radon control options for new buildings

Note: The ICS Code, scope and project need for this NOI (originally published on January 11, 2022) was updated by the responsible SDO on March 19, 2024. Note: The ICS Code for this NOI (originally published on January 11...