Refine Results
Displaying 7933 - 7944 of 11332
Notice of Intent
Electric boilers
1.1 This Standard applies to stationary, permanently connected, hot-water and steam boilers for use with nominal system voltages of 600 V and less, for residential, commercial, and industrial use in nonhazardous locations in...
Notice of Intent
Flexible metal conduit and liquid-tight flexible...
1.1 This Standard applies to flexible metal conduit and liquid-tight flexible metal conduit, trade sizes 12 (3/8) to 103 (4), excluding 14 (7/16), intended for use as a metal raceway for the installation of conductors in...
Notice of Intent
Primary shielded and concentric neutral cable...
1.1 The requirements of this Standard apply to materials, constructions, and testing of tree-retardant cross- linked polyethylene and ethylene propylene rubber-insulated single conductor or triplexed primary shielded and...
Notice of Intent
Electromagnetic compatibility (EMC) – Part 4-...
This part of IEC 61000 defines test methods for immunity to ripple at the d.c. input power port of electrical or electronic equipment. This part of IEC 61000-4 defines the methods for measurement and interpretation of results...
Notice of Intent
Equity, Diversity, Inclusion and Accessibility...
Note: The scope for this NOI (originally published on July 5, 2023) was updated by the responsible SDO on October 11, 2023. This Standard specifies requirements and provides guidelines for equity, diversity, inclusion, and...
Notice of Intent
Pressure-Indicating Gauges for Compressed Gas...
Note: The standards development activity for this NOI (originally published on February 22, 2022), was updated by the responsible SDO on March 1, 2022. 1.1 These minimum requirements cover indicating pressure gauges of the...
Notice of Intent
Construction Work - Drinking Water and Sewer ...
Note: The standard designation number for this NOI (originally published on February 22, 2022), was updated by the responsible SDO on March 1, 2022. 1. PURPOSE This standardized specification also applies to all work required...
Notice of Intent
Road vehicles - Liquefied natural gas (LNG) fuel...
Note: The scope for this NOI (originally published on March 1, 2022) was updated by the responsible SDO on April 21, 2022. This document specifies tests and requirements for the check valve, a liquefied natural gas fuel...
Notice of Intent
Road vehicles - Liquefied natural gas (LNG) fuel...
Note: The scope for this NOI (originally published on March 1, 2022) was updated by the responsible SDO on April 21, 2022. This document specifies tests and requirements for the manual valve, a liquefied natural gas fuel...
Notice of Intent
Road vehicles - Liquefied natural gas (LNG) fuel...
Note: The scope for this NOI (originally published on March 1, 2022) was updated by the responsible SDO on April 21, 2022. This document specifies tests and requirements for the tank pressure gauge, a liquefied natural gas...
Notice of Intent
Road vehicles - Liquefied natural gas (LNG) fuel...
Note: The scope for this NOI (originally published on March 1, 2022) was updated by the responsible SDO on April 21, 2022. This document specifies tests and requirements for the pressure relief valve (PRV), a liquefied...
Notice of Intent
Cyber Resiliency in Healthcare
Note: CIO Strategy Council announced an organizational name change to the Digital Governance Council (DGC), effective January 30, 2023 and the creation of a new standards development division, Digital Governance Standards...