Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 7729 - 7740 of 9257
Notice of Intent

Luminaires - Part 2: Particular Requirements...

This section of IEC 598-2 specifies requirements for luminaires with built-in transformers for filament lamps, with supply voltages and output voltages not exceeding: - 1 000 V for class I and class II luminaires; and - 250 V...
Notice of Intent

Paramedic ground response vehicles and equipment

Guidelines to: support manufacturers in designing emergency response vehicles and/or equipment in accordance with evidence-based practices; support the procurement of appropriately designed emergency response vehicles and/or...
Notice of Intent

Determination of the Airtightness of Building...

1.1 This is a method for the determination of the airtightness of building envelopes. It is not a method for determining the actual air leakage which occurs through a building envelope under the influence of wind and buoyancy...
Notice of Intent

Textile Test Methods - Determination of Length...

This method specifies two procedures for the determination of the length of yarns and threads in package form subject to the limitations as to stretchiness, linear density of the yarn being measured and the length of the yarn...
Notice of Intent

Framework for integrated community-based life...

This International Workshop Agreement provides a framework for addressing challenges faced by societies that have been unable to adapt to an ageing population. It can also be used by stakeholders as a useful reference at...
Notice of Intent

Textile Test Methods: Procedure for the Removal...

Note: This NOI was withdrawn by the responsible SDO on January 4, 2023. CAN/CGSB-4.2 No. 30.3-94 will become part of CAN/CGSB-4.2 No.27.5. 1.1This method describes the laundering and dry cleaning procedures for removing non...