Guidance for installation procedures and tolerances of hydroelectric machines - Part 4: Vertical Kap...
The purpose of IEC 63132-4:2020 is to establish, in a general way, suitable procedures and tolerances for the installation of a vertical Kaplan or propeller turbine. This document presents a typical assembly and whenever the word “turbine” is used in this document, it refers to a vertical Kaplan or propeller turbine. There are many possible ways to assemble a unit. The size of the machine, design…
Guidance for installation procedures and tolerances of hydroelectric machines - Part 1: General aspe...
The purpose of IEC 63132-1:2020 is to establish, in a general way, suitable procedures and tolerances for the installation of hydroelectric turbines and generators. This document presents a typical assembly. There are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse and delivery schedule of the components are some of the elements…
Guidance for installation procedures and tolerances of hydroelectric machines - Part 2: Vertical gen...
The purpose of IEC 63132-2:2020 is to establish, in a general way, suitable procedures and tolerances for installation of generator. This document presents a typical assembly. There are many possible ways to assemble a unit. The size of the machines, design of the machines, layout of the powerhouse or delivery schedule of the components are some of the elements that could result in additional…
This document specifies quality aspects that can be defined but that are not normally found on a drawing specification.
It covers the following:
— single‑piece piston rings of grey cast iron or steel;
— multi‑piece piston rings (oil control rings) consisting of cast iron parts and spring components; and
— single‑piece and multi‑piece oil control rings of steel, i.e. oil control rings…
Petroleum and natural gas industries — Floating offshore structures — Part 1: Ship-shaped, semi-subm...
1 Scope
This document provides requirements and guidance for the structural design and/or assessment of
floating offshore platforms used by the petroleum and natural gas industries to support the following
functions:
— production;
— storage and/or offloading;
— drilling and production;
— production, storage and offloading;
— drilling, production, storage and offloading.
NOTE 1 Floating…
Carbon dioxide capture, transportation and geological storage — Carbon dioxide storage using enhance...
1 Scope
1.1 Applicability
This document applies to carbon dioxide (CO2) that is injected in enhanced recovery operations for
oil and other hydrocarbons (CO2-EOR) for which quantification of CO2 that is safely stored long-term
in association with the CO2-EOR project is sought. Recognizing that some CO2-EOR projects use nonanthropogenic
CO2 in combination with anthropogenic CO2, the document…
Implants for surgery — Active implantable medical devices — Part 2: Cardiac pacemakers
This document specifies requirements that are applicable to those active implantable medical devices intended to treat bradyarrhythmias and devices that provide therapies for cardiac resynchronization.
The tests that are specified in this document are type tests, and are to be carried out on samples of a device to show compliance.
This document was designed for bradyarrhythmia pulse generators…
Systems and software engineering — Lifecycle profiles for Very Small Entities (VSEs) — Part 3-2: Con...
1 Scope
This document:
— defines the rules applicable for certification of the implementation of systems engineering, software engineering and service delivery processes complying with the requirements given in ISO/IEC 29110-4-m, Profile specifications; and
— provides the necessary information and confidence to customers about the way certification of their suppliers has been granted.…
Petroleum and natural gas industries — Floating offshore structures — Part 1: Ship-shaped, semi-subm...
This document provides requirements and guidance for the structural design and/or assessment of floating offshore platforms used by the petroleum and natural gas industries to support the following functions:
— production;
— storage and/or offloading;
— drilling and production;
— production, storage and offloading;
— drilling, production, storage and…
Explosive atmospheres — Part 13: Equipment protection by pressurized room “p” and artificially venti...
This part of IEC 60079 gives requirements for the design, construction, assessment,
verification and marking of rooms used to protect internal equipment:
– located in a Zone 1 or Zone 2 or Zone 21 or Zone 22 explosive atmosphere (an area
normally requiring an equipment protection level (EPL) Gb, Gc, Db or Dc) without an
internal source of gas/vapour release and protected by pressurization…