Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 1957 - 1968 of 9145
Notice of Intent

Standard for Fire Hydrants

This Standard covers dry barrel type hydrants intended for use in piping systems supplying water for fire protection service. Hydrants shall be designed for a minimum working pressure of 1000 kPa. Hydrants of special design...
Notice of Intent

Wood preservation

This is the tenth edition of the CSA O80 Series of Standards, Wood preservation. It supersedes the previous editions published in 1997, 1989, 1983, 1974, 1970, 1966, 1962, 1959, and 1954. 1.1 The CSA O80 Series of Standards...
Notice of Intent

Pressure vessel, and pressure piping code

1.1 Except as indicated in Clause 1.2, Part 1 of this Standard applies to all boilers, pressure vessels, pressure piping, and fittings, as provided for by the Act (as defined in Clause 3) and identified in Part 1 of this...
Notice of Intent

Electrical Coordination

The provisions of this Standard embody the principles and practices applicable for the purpose of effecting electrical coordination between organizations that operate electric supply or communications systems, where...
Notice of Intent

Standard for Safety for Systems of Insulating...

1 Scope 1.1 These requirements cover test procedures to be used in the evaluation of Class 120(E) or higher electrical insulation systems (EIS) for use in the United States, and Class 130(B) or higher EIS for use in Canada...
Notice of Intent

Well integrity management for petroleum and ...

This Standard covers the integrity management for the life cycle of wells in the land-based upstream sector of the petroleum and natural gas industry. 1.1 The purpose of this Standard is to provide minimum requirements for...
Notice of Intent

Natural and Nature-based Solutions – monitoring...

Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of May 7 to May 29, 2024 (originally published...