Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 1645 - 1656 of 9144
Notice of Intent

Standard for Temporary Lighting Strings

1 SCOPE 1.1 These requirements cover temporary lighting strings rated not more than 20 A, 125 V, intended for indoor and outdoor use to provide temporary illumination during the period of construction, remodeling, maintenance...
Notice of Intent

Standard for Emergency Breakaway Fittings for...

1 SCOPE 1.1 These requirements cover emergency breakaway fittings intended only for flammable and combustible liquid service including gasoline with up to 15 % ethanol. 1.2 An emergency breakaway fitting is intended for use...
Notice of Intent

UN/EDIFACT Invoice Message (Joint CAN/CGSB-200...

1.1 Functional Definition A message claiming payment for goods or services supplied under conditions agreed between the seller and the buyer. This message, with correct data qualification, serves also as the specification for...
Notice of Intent

Information technology - Personal identification...

ISO/IEC 18013 establishes guidelines for the design format and data content of an ISO-compliant driving licence (IDL) with regard to human-readable features (ISO/IEC 18013-1), machine-readable technologies (ISO/IEC 18013-2)...
Notice of Intent

Standard for Safety for Safety Cans

1 Scope 1.1 These requirements cover metallic and nonmetallic safety cans that have a maximum capacity of 5.3 US gallons (20 L) and that are intended to store and handle flammable and combustible liquids in commercial and...
Notice of Intent

Information technology - Personal identification...

ISO/IEC 18013 establishes guidelines for the design format and data content of an ISO-compliant driving licence (IDL) with regard to human-readable features (ISO/IEC 18013-1), machine-readable technologies (ISO/IEC 18013-2)...
Notice of Intent

Standard For 650 °C Factory- Built Chimneys

Note: The scope for this NOI (originally published on March 16, 2021) was updated by the responsible SDO on July 27, 2021. 1.1 These requirements apply to factory-built chimney assemblies which do not require field...
Notice of Intent

Hardware for the support of conduit, tubing, ...

1.1 These requirements cover hardware for the support of conduit, tubing, and cable, such as HANGERS, STAPLES, STRAPS, and similar devices for installation in accordance with the National Electrical Code, NFPA 70, and the...