Refine Results
Displaying 205 - 216 of 8733
Publications
Corporate Plan Summary 2017-2018 - "Enabling ...
SCC’s Corporate Plan Summary provides an overview of the organization’s operational direction.
Notice of Intent
Standard for Flexible Underground Hose Connectors...
This Standard sets forth requirements for flexible underground hose connectors intended for flammable and combustible liquid service at temperatures within the range of -40 °C to +50 °C. This Standard also sets forth...
Notice of Intent
The Standard for Safety for Polyvinyl Chloride...
Please note the scope was updated as requested by the responsible SDO on March 12, 2019. 1 Scope 1.1 In the US, this standard covers the following: (a) Thermoplastic and rubber tapes for use as electrical insulation at not...
Notice of Intent
Standard for Factory-Built Type A Chimneys
1.1 These requirements apply to Factory-Built Type A Chimneys, which do not require field fabrication. They are for use with gas and liquid fuel-fired residential appliances and building heating equipment, where the appliance...
Notice of Intent
Standard for Factory-Built Grease Ducts
These requirements cover factory-built grease ducts and grease duct assemblies that are intended to be installed as alternatives to the grease ducts constructed of all welded 1.37 mm carbon steel or 1.09 mm stainless steel...
Notice of Intent
Standard for Halocarbon Clean Agent Fire Extinguishers
1 SCOPE 1.1 These requirements cover the construction and performance, exclusive of performance during fire tests, of portable halocarbon clean agent fire extinguishers. Halocarbon clean agent fire extinguishers are intended...
Notice of Intent
Reusable Packaging System Design Standard: Container...
This Container Design Standard specifies design requirements and recommendations for reusable containers. It is applicable to containers that are intended to be part of an interoperable reuse ecosystem that utilizes common...
Notice of Intent
Standard for Foam Equipment and Liquid Concentrates
Note: The title and scope were updated by the responsible SDO on October 14, 2020. 1.1 These requirements cover foam producing equipment and liquid concentrates employed for the production and discharge of foam that has an...
Notice of Intent
Standard for Electrically Operated Valves for...
Note: This notice of intent was withdrawn by the responsible SDO on June 20, 2023. Note: The standard development activity for this NOI (originally published on June 6, 2023) was updated by the responsible SDO on June 13...
Notice of Intent
Standard for Fire Test for Circuit Integrity ...
1.1 The intent of this Standard is to evaluate the integrity of power, control, instrumentation, and data cables for their ability to maintain circuit integrity when subjected to standard fire test exposure and associated...
Notice of Intent
Standard for Factory-Built Grease Ducts
1.1 These requirements cover factory-built grease ducts and grease duct assemblies that are intended to be installed as alternatives to the grease ducts constructed of all welded 1.37 mm carbon steel or 1.09 mm stainless...
Notice of Intent
Standard for Halocarbon Clean Agent Extinguishing...
These requirements cover the construction and operation of halocarbon clean agent fire extinguishing system units intended to be installed, inspected, tested, and maintained in accordance with the Standard on Clean Agent Fire...