Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 10849 - 10860 of 10980
Accreditation Bulletin

Revised Edition of the Accreditation Services...

Action required Effective July 1st, 2020, all customers are required to take note of the changes in the revised Accreditation Program Overview . The changes are noted below. Affected customers Customers in any of SCC’s...
Accreditation Bulletin

Corrigendum to correct errors in RG_PT_v2_2020...

Action required Laboratories who have not been able to identify an accredited proficiency testing (PT) provider, and unaccredited PT provider, or an interlaboratory comparison program, should note that item 4 in section 6.2...
Accreditation Bulletin

Revised Edition of the Program Overview

Action required Effective November 1st, 2019, all customers are required to take note of the changes in the revised Accreditation Program Overview . The changes are noted below. Affected customers These changes affect all...
Accreditation Bulletin

SCC Requirements and Guidance for Accreditation...

Action required Effective immediately, all laboratories accredited under the Test Method Development and Non-Routine Testing program specialty area (PSA) must now refer to SCC Requirements and Guidance for Accreditation of...
Accreditation Bulletin

SCC Requirements and Guidance for Accreditation...

Action required All SCC laboratories engaged in Test Method Development and Non-Routine Testing shall conform to the revised edition of the SCC Requirements and Guidance for Accreditation of Laboratories Engaged in Test...
Notice of Intent

Low-voltage switchgear and controlgear - Part...

1.1 Scope This part of IEC 60947 applies to the types of equipment listed in 1.1.1 and 1.1.2 whose main contacts are intended to be connected to circuits the rated voltage of which does not exceed 1 000 V a.c. or 1 500 V d.c...
Notice of Intent

Solar collectors

Scope 1.1 This Standard specifies a set of technical requirements and test methods for glazed and unglazed liquid heating solar collectors and covers operating performance and marking requirements. 1.2 This Standard applies...
Notice of Intent

Design and installation of ground source heat...

ANSI/CSA/IGSHPA C448.3-16 - Installation of vertical configured closed- loop ground source heat pump systems Scope 1.1 This Standard applies to vertical closed-loop ground heat exchangers that are to be connected to a ground...
Notice of Intent

Low-voltage switchgear and controlgear - Part...

1.1 Scope This part of IEC 60947 applies to the types of equipment listed in 1.1.1 and 1.1.2 whose main contacts are intended to be connected to circuits the rated voltage of which does not exceed 1 000 V a.c. or 1 500 V d.c...
Notice of Intent

Boiler, pressure vessel, and pressure piping ...

B51-19, Part 1 - General requirements for boilers, pressure vessels, and pressure piping Scope 1.1 Except as indicated in Clause 1.2, Part 1 of this Standard applies to all boilers, pressure vessels, pressure piping, and...