Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 10465 - 10476 of 10816
Notice of Intent

Explosive atmospheres — Part 28: Protection of...

This part of IEC 60079 specifies the requirements, testing and marking of equipment emitting optical radiation intended for use in explosive atmospheres. It also covers equipment located outside the explosive atmosphere or...
Notice of Intent

Single pole locking-type separable connectors...

1.1 These requirements cover single pole locking-type separable attachment plugs, cord connectors, panel inlets, and panel outlets, adapters, and accessories, rated up to a maximum of 800 amperes and up to 600 volts ac or dc...
Notice of Intent

Residential Mechanical Ventilation Systems

1.1 This Standard defines the requirements for performance, installation and application, and performance verification of mechanical ventilation systems. This Standard applies to systems that are capable of providing minimum...
Notice of Intent

Control of Hazardous Energy - Lockout and Other...

Scope of Work Consider expanding Standard scope to include energy derived from radioactive isotopes (i.e., nuclear energy). Review and update reference documents. Review definitions and terminology. Proposal (based on Z244.1)...
Notice of Intent

Systems and software engineering -- Requirements...

This document supports the interest of software users in receiving consistent, complete, accurate, and usable documentation and specifies processes for use in testing and reviewing of user documentation (Clause 6). It is not...
Notice of Intent

Information Technology - Computer Graphics and...

Scope This part of ISO/IEC 12087 facilitates the interchange of digital images. For this purpose, conceptual, architectural, and functional definitions of the Image Interchange Facility (IPI- IIF) are established. ISO/IEC...
Notice of Intent

Uninterruptible power systems

1 General Replace this clause of the RD with the following: 1.1.1 Equipment covered by this Standard This Standard applies to UNINTERRUPTIBLE POWER SYSTEMS (UPS). The primary function of the UPS for this Standard is to ensure...
Notice of Intent

Nonincendive Electrical Equipment for Use in ...

1.1 Introduction 1.1.1 The purpose of this standard is to provide minimum requirements for the design, construction, and marking of electrical equipment or parts of such equipment for use in Class I and Class II, Division 2...