Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 8245 - 8256 of 10840
Notice of Intent

Electromagnetic Compatibility (EMC) - Part 2: ...

Interest in magnetic fields has been stimulated in recent years by concern over the physiological effects they may have on humans and animals and the deleterious effects they have on the performance of some electrical...
Notice of Intent

Electromagnetic compatibility (EMC) - Part 4-...

This part of IEC 61000 is applicable to instrumentation intended for measuring spectral components in the frequency range up to 9 kHz which are superimposed on the fundamental of the power supply systems at 50 Hz and 60 Hz...
Notice of Intent

Road vehicles - Liquefied natural gas (LNG) fuel...

Note: The scope for this NOI (originally published on March 1, 2022) was updated by the responsible SDO on April 21, 2022. This document specifies tests and requirements for the tank pressure gauge, a liquefied natural gas...
Notice of Intent

Standard for Fire Hydrants

SCOPE 1.1 This Standard covers dry barrel type hydrants intended for use in piping systems supplying water for fire protection service. 1.2 Hydrants shall be designed for a minimum working pressure of 1000 kPa. 1.3 Hydrants...
Notice of Intent

Bonding of electrical equipment

1.1 This Standard applies to electrical equipment that is intended for installation and use in accordance with the requirements of Part I of the Canadian Electrical Code (CE Code) and is a) cord connected or permanently...
Notice of Intent

Performance of EV DC Fast Battery Chargers

The project will focus on DCFC with 20kW to 350kW of rated power output. The draft standard will include test methods to determine efficiency at representative temperatures (e.g. -30C, -7C, 20C and 40C) and different loading...
Notice of Intent

Standard for Safety for Commercial-Industrial...

1.1 These requirements apply to factory-built gas-fired package boilers having input ratings of more than 117,228 W (400,000 Btu/h), per individual combustion chamber, and intended primarily for commercial and industrial...
Notice of Intent

Primary shielded and concentric neutral cable...

1.1 The requirements of this Standard apply to materials, constructions, and testing of tree-retardant cross- linked polyethylene and ethylene propylene rubber-insulated single conductor or triplexed primary shielded and...
Notice of Intent

Equity, Diversity, Inclusion and Accessibility...

Note: The scope for this NOI (originally published on July 5, 2023) was updated by the responsible SDO on October 11, 2023. This Standard specifies requirements and provides guidelines for equity, diversity, inclusion, and...
Notice of Intent

Pressure-Indicating Gauges for Compressed Gas...

Note: The standards development activity for this NOI (originally published on February 22, 2022), was updated by the responsible SDO on March 1, 2022. 1.1 These minimum requirements cover indicating pressure gauges of the...