Refine Results
Displaying 25 - 36 of 86
Notice of Intent
Household and similar electrical appliances - ...
Note: As requested by the responsible SDO, this NOI being reissued as the standard was in the initial stages of development for more than 12 months. An additional comment period of October 16 to November 6, 2024 (originally...
Notice of Intent
Low-voltage switchgear and controlgear — Part...
Note: The standard development activty of this Notice of Intent (originally published on August 20, 2024) was updated by the responsible SDO on October 8, 2024. This document applies, when required by the relevant product...
Notice of Intent
Ground-fault circuit-interrupters
Note: The standard development activity of this Notice of Intent (originally published on June 4, 2024) was updated by the responsible SDO on September 4, 2024. 1.1 This Standard applies to Class A, single- and three-phase...
Workplace electrical safety
1.1 General This Standard specifies requirements for workplace electrical safety necessary for the practical safeguarding of workers during activities such as the installation, inspection, operation, maintenance, and...
Notice of Intent
General requirements for pressure-retaining systems...
1 Scope 1.1 This Standard specifies the technical requirements for the design, procurement, fabrication, installation, modification, repair, replacement, testing, examination, and inspection of, and other work related to...
Notice of Intent
Supplement #1 to CSA F379 Series-09, Packaged...
1.1 This Standard applies to the performance, durability, and safety of packaged solar domestic hot water (SDHW) systems that use liquid-to-liquid heat transfer and liquid heat storage media suitable for year-round use. 1.2...
Notice of Intent
Natural Gas and Propane Installation Code
Scope 1.1 This Code applies to the installation of (a) appliances, equipment, components, and accessories where gas is to be used for fuel purposes; (b) piping and tubing systems extending from the termination of the utility...
Notice of Intent
Standard for Dry Pipe and Deluge Valves for Fire...
Note: The scope and ICS code for this NOI have been updated (originally published on August 5, 2020) was updated by the responsible SDO on December 20, 2022. 1.1 These requirements cover valve equipment intended for...
Notice of Intent
Standard for Thermal Insulation - Closed Cell...
Note: The scope for this NOI was updated by the responsible SDO on April 20, 2021 and the title was updated on August 16, 2022. (originally published on April 16, 2020). 1.1 This Standard outlines requirements for the...
Notice of Intent
Washer-disinfectors — Part 1: General requirements...
1 Scope This part of ISO 15883 specifies general performance requirements for washer-disinfectors (WD) and their accessories that are intended to be used for cleaning and disinfection of re-usable medical devices and other...
Notice of Intent
Component Tapes
Note: The scope for this NOI (originally published on March 8, 2022) was updated by the responsible SDO on November 16, 2022. 1 Scope 1.1 This standard covers tape having constructional features such as reinforcement...
Accreditation Bulletin
Transition requirements for SCC’s Greenhouse ...
Action required All accredited Greenhouse Gas Accreditation Program (GHGAP) organizations must ensure they complete transition reviews to the applicable standards by the deadline. Affected customers Existing SCC GHGAP...