Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 1093 - 1104 of 1644
Notice of Intent

Standard for Power-Operated Dispensing Devices...

1.1 These requirements apply to power-operated dispensing devices, rated 600 V ac or less, for use with motor fuels. Motor fuels, as defined by these requirements, include one or more of the fuels described in 1.3. 1.2 Power...
Notice of Intent

The Standard for Safety for Unmanned Aircraft...

These requirements cover the electrical system of unmanned aircraft systems (UASs), as defined in this Standard, used in flight for commercial applications or flight incidental to business applications. UASs covered by these...
Notice of Intent

Earth-Moving Machinery - Tip-Over Protection ...

This International Standard establishes a consistent and reproducible means of evaluating the load-carrying characteristics of tip-over protective structures (TOPS) under static loading, and prescribes performance...
Notice of Intent

Standard for Pre-Engineered Dry and Wet Chemical...

Note: The project need for this NOI (originally published on April 8, 2021) was updated by the responsible SDO on June 22, 2021. These requirements cover the construction and operation of fixed pre-engineered dry chemical...
Notice of Intent

Standard for Pre-Engineered Dry and Wet Chemical...

These requirements cover the construction and operation of fixed pre-engineered dry chemical fire extinguishing system units and fixed automatic extinguisher units intended to be used in accordance with the Standard for Dry...
Notice of Intent

Standard for Safety for Energy Storage Systems...

1.1 These requirements cover energy storage systems that are intended to receive and store energy in some form so that the energy storage system can provide electrical energy to loads or to the local/area electric power...
Notice of Intent

Standard for Hose and Hose Assemblies for Use...

1.1 These requirements cover hose and hose assemblies, including vapor recovery hose and assemblies, for use on dispensing devices for motor fuels. A flammable liquid hose assembly consists of flexible hose and fittings...