Search

Refine Results
Type
Program
Status
Country
Province
City
Program Specialty Area
Field of Testing
Period range

From

To

Displaying 9853 - 9864 of 9874
Notice of Intent

Standard for Power-Operated Pumps for Gasoline...

1.1 These requirements cover products described in 1.3 when used with one or more of the fuels described in 1.4. 1.2 Pumps for gasoline/ethanol blends with nominal ethanol concentrations up to 85 percent (E0 – E85) shall be...
Notice of Intent

Standard for Power-Operated Pumps for Diesel ...

1.1 These requirements cover products described in 1.3 when used with one or more of the fuels described in 1.4. 1.2 Pumps for Diesel Fuel, Biodiesel Fuel, Diesel/Biodiesel Blends with Nominal Biodiesel Concentrations up to...
Notice of Intent

Valves for Gasoline and Gasoline/Ethanol Blends...

1.1 These requirements cover valves that are intended to be used for the control of fluids and their vapors for the fluids indicated in 1.3. They are of the type commonly used in piping systems and in the assembly of motor...
Notice of Intent

Valves for Diesel Fuel, Biodiesel Fuel, Diesel...

1.1 These requirements cover valves that are intended to be used for the control of fluids and their vapors for the fluids indicated in 1.3. They are of the type commonly used in piping systems and in the assembly of motor...
Notice of Intent

Standard for Safety for Energy Storage Systems...

1 Scope 1.1 These requirements cover an energy storage system (ESS) that is intended to receive and store energy in some form so that the ESS can provide electrical energy to loads or to the local/area electric power system...
Notice of Intent

Standard for Pre-Engineered Dry and Wet Chemical...

Note: The project need for this NOI (originally published on April 8, 2021) was updated by the responsible SDO on June 22, 2021. These requirements cover the construction and operation of fixed pre-engineered dry chemical...
Notice of Intent

Standard for Pre-Engineered Dry and Wet Chemical...

These requirements cover the construction and operation of fixed pre-engineered dry chemical fire extinguishing system units and fixed automatic extinguisher units intended to be used in accordance with the Standard for Dry...
Notice of Intent

Standard for Hose and Hose Assemblies for Use...

1.1 These requirements cover hose and hose assemblies, including vapor recovery hose and assemblies, for use on dispensing devices for motor fuels. A flammable liquid hose assembly consists of flexible hose and fittings...
Notice of Intent

Radon mitigation options for existing buildings

Note: The ICS Code, scope and project need for this NOI (originally published on January 11, 2022) was updated by the responsible SDO on March 19, 2024. Note: The title and scope for this NOI (originally published on January...
Notice of Intent

Vehicle to grid charging equipment

Note: The scope for this NOI (originally published on December 8, 2020) was updated by the responsible SDO on August 22, 2023. 1.1 The requirements of this standard apply to off-board unidirectional and bidirectional...
Notice of Intent

Standard for Safety for Fuel Tank Accessories...

Note: The title and scope for this NOI was updated by the responsible SDO on March2 ,2021 (originally published July 14, 2020) 1.1 These requirements cover mechanical type accessories that are typically intended for...