Search

Refine Results
Type
Program
Status
Country
Province
City
Program Specialty Area
Field of Testing
Period range

From

To

Displaying 9445 - 9456 of 9875
Notice of Intent

Ethical Use of Artificial Intelligence Tools ...

Note: The title, scope and project need for this NOI (originally published on May 9, 2023) were updated by the responsible SDO on May 14, 2024. This Standard specifies minimum requirements for incorporating ethics in the...
Notice of Intent

Household and similar electrical appliances - ...

This clause of Part 1 is replaced by the following. This International Standard deals with the safety of electric range hoods and other cooking fume extractors intended for installing above, beside, behind or under household...
Notice of Intent

Standard for Installation of Fire Alarm Systems

This Standard describes the requirements for the design and installation of a fire alarm system with or without voice communication capability. This Standard is intended to apply to both required and voluntary fire alarm...
Notice of Intent

Standard for Aboveground Nonmetallic Tanks for...

This Standard covers the minimum requirements for nonmetallic or composite primary tanks, secondary tanks, and open or closed secondary containments from 227 to 2500 L (60 to 660 US gal) primary tank capacity intended...
Notice of Intent

Standard for Integrated Systems Testing of Fire...

This Standard prescribes the methodology for verifying and documenting that all interconnections between systems provided for fire protection and life safety functions are installed and operating in conformance with their...
Notice of Intent

Photovoltaic (PV) module safety qualification...

This part of IEC 61730 specifies and describes the fundamental construction requirements for photovoltaic (PV) modules in order to provide safe electrical and mechanical operation. Specific topics are provided to assess the...
Notice of Intent

Low-voltage fuses - Part 19: Photovoltaic fuses

Note: The standard development activity of this Notice of Intent (originally published on March 26, 2024) was updated by the responsible SDO on 3 July 2024. 1.1 This Part applies to fuses for photovoltaic (PV) systems rated...