Search

Refine Results
Type
Program
Status
Country
Province
City
Accreditation Sub-Programs
Program Specialty Area
GLP Area of Expertise
Field of Testing
Fields of Compliance
Period range

From

To

Displaying 1069 - 1080 of 1672
Notice of Intent

Safety requirements for electrical equipment ...

This IEC second edition cancels and replaces the first edition published in 2016. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous...
Notice of Intent

Safety requirements for electrical equipment ...

This IEC second edition cancels and replaces the first edition published in 2012. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous...
Notice of Intent

Safety requirements for electrical equipment ...

Scope: 1 Scope and object This clause of Part 1 is applicable except as follows: 1.1.1 Equipment included in scope Replacement: Replace the second paragraph by the following: This part of IEC 61010 specifies safety...
Notice of Intent

Safety requirements for electrical equipment ...

1 Scope and object 1.1 Scope 1.1.1 Probe assemblies included in scope This part of IEC 61010 specifies safety requirements for hand-held and handmanipulated probe assemblies of the types described below, and their related...
Notice of Intent

Standard for Safety for Door, Drapery, Gate, ...

These requirements cover electric operators for doors, draperies, gates, louvers, windows, exterior awnings and other opening and closing appliances rated 600 V or less to be employed in ordinary locations in accordance with...
Notice of Intent

Standard for Safety for Batteries for Use in ...

Note: The scope for this NOI (originally published on December 18, 2018) was updated by the responsible SDO on February 1, 2022. 1 Scope 1.1 These requirements cover battery systems as defined by this standard for use as...
Notice of Intent

Relocatable Structures

1 SCOPE 1.1 This standard provides the requirements for modular built relocatable temporary structures. 1.2 Relocatable structures for temporary use are a form of modular construction, built in an approved offsite facility...
Notice of Intent

Standard for Flexible Metallic Hose

1.1 These requirements cover flexible metallic hose supplied with fittings on each end that facilitate connection without twisting the hose. They have a corrugated metal core or a nonmetallic inner core which are covered with...
Notice of Intent

Standard for Safety For Electrical Systems for...

Note: The project need for this NOI (originally published on August 18, 2020) was updated by the responsible SDO on June 22, 2021. 1 Scope 1.1 This Standard covers the electrical system of eBikes powered by a lithium-based...
Notice of Intent

Standard for Safety for LP-Gas Regulators

1.1 These requirements cover pressure regulators for use with LP-Gas equipment. NOTE: For the purposes of this standard the terms “LP-Gas” and “Propane” are interchangeable. 1.2 Regulators covered by these requirements are...
Notice of Intent

Standard for Shutoff Valves for Trim and Drain...

1.1 These requirements cover shutoff valves for trim and drain purposes for fire protection service. This standard covers valve constructions such as ball valves, butterfly valves, globe valves and plug valves. 1.2 These...
Notice of Intent

Safety requirements for electrical equipment ...

1.1.1.Equipment included in scope This document specifies safety requirements for hand-held multimeters and other meters for domestic and professional use, capable of measuring MAINS. HAND-HELD MULTImeters are multi-range...